Changes commencing December 12th, 2025
Comparing the consolidation as at November 28th, 2025 with December 12th, 2025 · 14 changes
Planning certificates 1 Names of relevant planning instruments and development control plans (1) The name of each environmental planning instrument and development control plan that applies to the carrying out of development on the land. (2) The name of each proposed environmental planning instrument and draft development control plan, which is or has been subject to community consultation or public exhibition under the Act, that will apply to the carrying out of development on the land. (3) Subsection (2) does not apply in relation to a proposed environmental planning instrument or draft development control plan if— (a) it has been more than 3 years since the end of the public exhibition period for the proposed instrument or draft plan, or (b) for a proposed environmental planning instrument—the Planning Secretary has notified the council that the making of the proposed instrument has been deferred indefinitely or has not been approved. (4) In this section— proposed environmental planning instrument means a draft environmental planning instrument and includes a planning proposal for a local environmental plan. 2 Zoning and land use under relevant planning instruments The following matters for each environmental planning instrument or draft environmental planning instrument that includes the land in a zone, however described— (a) the identity of the zone, whether by reference to— (i) a name, such as “Residential Zone” or “Heritage Area”, or (ii) a number, such as “Zone No 2 (a)”, (b) the purposes for which development in the zone— (i) may be carried out without development consent, and (ii) may not be carried out except with development consent, and (iii) is prohibited, (c) whether additional permitted uses apply to the land, (d) whether development standards applying to the land fix minimum land dimensions for the erection of a dwelling house on the land and, if so, the fixed minimum land dimensions, (e) whether the land is in an area of outstanding biodiversity value under the Biodiversity Conservation Act 2016 , (f) whether the land is in a conservation area, however described, (g) whether an item of environmental heritage, however described, is located on the land. 3 Contributions (1) The name of each contributions plan under the Act, Division 7.1 applying to the land, including draft contributions plans. (2) If the land is in a region within the meaning of the Act, Division 7.1, Subdivision 4— (a) the name of the region, and (b) the name of the Ministerial planning order in which the region is identified. (3) If the land is in a special contributions area to which a continued 7.23 determination applies, the name of the area. (4) In this section— continued 7.23 determination means a 7.23 determination that— (a) has been continued in force by the Act, Schedule 4, Part 1, and (b) has not been repealed as provided by that part. Note— The Act, Schedule 4, Part 1 contains other definitions that affect the interpretation of this section. 4 Complying development (1) If the land is land on which complying development may be carried out under each of the complying development codes under State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 , because of that Policy, clause 1.17A(1)(c)–(e), (2), (3) or (4), 1.18(1)(c3) or 1.19. (2) If complying development may not be carried out on the land because of 1 of those clauses, the reasons why it may not be carried out under the clause. (3) If the council does not have sufficient information to ascertain the extent to which complying development may or may not be carried out on the land, a statement that— (a) a restriction applies to the land, but it may not apply to all of the land, and (b) the council does not have sufficient information to ascertain the extent to which complying development may or may not be carried out on the land. (4) If the complying development codes are varied, under that Policy, clause 1.12, in relation to the land. 5 Exempt development (1) If the land is land on which exempt development may be carried out under each of the exempt development codes under State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 , because of that Policy, clause 1.16(1)(b1)–(d) or 1.16A. (2) If exempt development may not be carried out on the land because of 1 of those clauses, the reasons why it may not be carried out under the clause. (3) If the council does not have sufficient information to ascertain the extent to which exempt development may or may not be carried out on the land, a statement that— (a) a restriction applies to the land, but it may not apply to all of the land, and (b) the council does not have sufficient information to ascertain the extent to which exempt development may or may not be carried out on the land. (4) If the exempt development codes are varied, under that Policy, clause 1.12, in relation to the land. 6 Affected building notices and building product rectification orders (1) Whether the council is aware that— (a) an affected building notice is in force in relation to the land, or (b) a building product rectification order is in force in relation to the land that has not been fully complied with, or (c) a notice of intention to make a building product rectification order given in relation to the land is outstanding. (2) In this section— affected building notice has the same meaning as in the Building Products (Safety) Act 2017 , Part 4. building product rectification order has the same meaning as in the Building Products (Safety) Act 2017 . 7 Land reserved for acquisition Whether an environmental planning instrument or proposed environmental planning instrument referred to in section 1 makes provision in relation to the acquisition of the land by an authority of the State, as referred to in the Act, section 3.15. 8 Road widening and road realignment Whether the land is affected by road widening or road realignment under— (a) the Roads Act 1993 , Part 3, Division 2, or (b) an environmental planning instrument, or (c) a resolution of the council. 9 Flood related development controls (1) If the land or part of the land is within the flood planning area and subject to flood related development controls. (2) If the land or part of the land is between the flood planning area and the probable maximum flood and subject to flood related development controls. (3) In this section— flood planning area has the same meaning as in the Flood Risk Management Manual. Flood Risk Management Manual means the Flood Risk Management Manual , ISBN 978-1-923076-17-4 , published by the NSW Government in June 2023. probable maximum flood has the same meaning as in the Flood Risk Management Manual. 10 Council and other public authority policies on hazard risk restrictions (1) Whether any of the land is affected by an adopted policy that restricts the development of the land because of the likelihood of land slip, bush fire, tidal inundation, subsidence, acid sulfate soils, contamination, aircraft noise, salinity, coastal hazards, sea level rise or another risk, other than flooding. (2) In this section— adopted policy means a policy adopted— (a) by the council, or (b) by another public authority, if the public authority has notified the council that the policy will be included in a planning certificate issued by the council. 11 Bush fire prone land (1) If any of the land is bush fire prone land, designated by the Commissioner of the NSW Rural Fire Service under the Act, section 10.3, a statement that all or some of the land is bush fire prone land. (2) If none of the land is bush fire prone land, a statement to that effect. 12 Loose-fill asbestos insulation If the land includes residential premises, within the meaning of the Home Building Act 1989 , Part 8, Division 1A, that are listed on the Register kept under that Division, a statement to that effect. 13 Mine subsidence Whether the land is declared to be a mine subsidence district, within the meaning of the Coal Mine Subsidence Compensation Act 2017 . 14 Paper subdivision information (1) The name of a development plan adopted by a relevant authority that— (a) applies to the land, or (b) is proposed to be subject to a ballot. (2) The date of a subdivision order that applies to the land. (3) Words and expressions used in this section have the same meaning as in this Regulation, Part 10 and the Act, Schedule 7. 15 Property vegetation plans If the land is land in relation to which a property vegetation plan is approved and in force under the Native Vegetation Act 2003 , Part 4, a statement to that effect, but only if the council has been notified of the existence of the plan by the person or body that approved the plan under that Act. 16 Biodiversity stewardship sites If the land is a biodiversity stewardship site under a biodiversity stewardship agreement under the Biodiversity Conservation Act 2016 , Part 5, a statement to that effect, but only if the council has been notified of the existence of the agreement by the Biodiversity Conservation Trust. Note— Biodiversity stewardship agreements include biobanking agreements under the Threatened Species Conservation Act 1995 , Part 7A that are taken to be biodiversity stewardship agreements under the Biodiversity Conservation Act 2016 , Part 5. 17 Biodiversity certified land If the land is biodiversity certified land under the Biodiversity Conservation Act 2016 , Part 8, a statement to that effect. Note— Biodiversity certified land includes land certified under the Threatened Species Conservation Act 1995 , Part 7AA that is taken to be certified under the Biodiversity Conservation Act 2016 , Part 8. 18 Orders under Trees (Disputes Between Neighbours) Act 2006 Whether an order has been made under the Trees (Disputes Between Neighbours) Act 2006 to carry out work in relation to a tree on the land, but only if the council has been notified of the order. 19 Annual charges under Local Government Act 1993 for coastal protection services that relate to existing coastal protection works (1) If the Coastal Management Act 2016 applies to the council, whether the owner, or a previous owner, of the land has given written consent to the land being subject to annual charges under the Local Government Act 1993 , section 496B, for coastal protection services that relate to existing coastal protection works. (2) In this section— existing coastal protection works has the same meaning as in the Local Government Act 1993 , section 553B. Note— Existing coastal protection works are works to reduce the impact of coastal hazards on land, such as seawalls, revetments, groynes and beach nourishment, that existed before 1 January 2011. 20 Western Sydney Aerotropolis Whether under State Environmental Planning Policy (Precincts—Western Parkland City) 2021 , Chapter 4 the land is— (a) in an ANEF or ANEC contour of 20 or greater, as referred to in that Chapter, section 4.17, or (b) shown on the Lighting Intensity and Wind Shear Map , or (c) shown on the Obstacle Limitation Surface Map , or (d) in the “public safety area” on the Public Safety Area Map , or (e) in the “3 kilometre wildlife buffer zone” or the “13 kilometre wildlife buffer zone” on the Wildlife Buffer Zone Map . 21 Development consent conditions for seniors housing If State Environmental Planning Policy (Housing) 2021 , Chapter 3, Part 5 applies to the land, any conditions of a development consent granted after 11 October 2007 in relation to the land that are of the kind set out in that Policy, section 88(2). 22 Site compatibility certificates and development consent conditions for affordable rental housing (1) Whether there is a current site compatibility certificate under State Environmental Planning Policy (Housing) 2021 , or a former site compatibility certificate, of which the council is aware, in relation to proposed development on the land and, if there is a certificate— (a) the period for which the certificate is current, and (b) that a copy may be obtained from the Department. (2) If State Environmental Planning Policy (Housing) 2021 , Chapter 2, Part 2, Division 1 or 5 applies to the land, any conditions of a development consent in relation to the land that are of a kind referred to in that Policy, section 21(1) or 40(1). (3) Any conditions of a development consent in relation to land that are of a kind referred to in State Environmental Planning Policy (Affordable Rental Housing) 2009 , clause 17(1) or 38(1). (4) In this section— former site compatibility certificate means a site compatibility certificate issued under State Environmental Planning Policy (Affordable Rental Housing) 2009 . 23 Water or sewerage services If water or sewerage services are, or are to be, provided to the land under the Water Industry Competition Act 2006 , a statement to that effect. Note— A public water utility may not be the provider of some or all of the services to the land. If a water or sewerage service is provided to the land by a licensee under the Water Industry Competition Act 2006 , a contract for the service will be deemed to have been entered into between the licensee and the owner of the land. A register relating to approvals and licences necessary for the provision of water or sewerage services under the Water Industry Competition Act 2006 is maintained by the Independent Pricing and Regulatory Tribunal and provides information about the areas serviced, or to be serviced, under that Act. Purchasers should check the register to understand who will service the property. Outstanding charges for water or sewerage services provided under the Water Industry Competition Act 2006 become the responsibility of the purchaser. 24 Special entertainment precincts Whether the land or part of the land is in a special entertainment precinct within the meaning of the Local Government Act 1993 , section 202B.
Based on content from the New South Wales Legislation website sourced at 2025-12-12. For the latest information on New South Wales Government legislation please go to https://www.legislation.nsw.gov.au.
This is an unofficial reproduction provided for convenience. It is not the official version of the legislation. For the official, in-force version, see legislation.nsw.gov.au.
Planning certificates 1 Names of relevant planning instruments and development control plans (1) The name of each environmental planning instrument and development control plan that applies to the carrying out of development on the land. (2) The name of each proposed environmental planning instrument and draft development control plan, which is or has been subject to community consultation or public exhibition under the Act, that will apply to the carrying out of development on the land. (3) Subsection (2) does not apply in relation to a proposed environmental planning instrument or draft development control plan if— (a) it has been more than 3 years since the end of the public exhibition period for the proposed instrument or draft plan, or (b) for a proposed environmental planning instrument—the Planning Secretary has notified the council that the making of the proposed instrument has been deferred indefinitely or has not been approved. (4) In this section— proposed environmental planning instrument means a draft environmental planning instrument and includes a planning proposal for a local environmental plan. 2 Zoning and land use under relevant planning instruments The following matters for each environmental planning instrument or draft environmental planning instrument that includes the land in a zone, however described— (a) the identity of the zone, whether by reference to— (i) a name, such as “Residential Zone” or “Heritage Area”, or (ii) a number, such as “Zone No 2 (a)”, (b) the purposes for which development in the zone— (i) may be carried out without development consent, and (ii) may not be carried out except with development consent, and (iii) is prohibited, (c) whether additional permitted uses apply to the land, (d) whether development standards applying to the land fix minimum land dimensions for the erection of a dwelling house on the land and, if so, the fixed minimum land dimensions, (e) whether the land is in an area of outstanding biodiversity value under the Biodiversity Conservation Act 2016 , (f) whether the land is in a conservation area, however described, (g) whether an item of environmental heritage, however described, is located on the land. 3 Contributions (1) The name of each contributions plan under the Act, Division 7.1 applying to the land, including draft contributions plans. (2) If the land is in a region within the meaning of the Act, Division 7.1, Subdivision 4— (a) the name of the region, and (b) the name of the Ministerial planning order in which the region is identified. (3) If the land is in a special contributions area to which a continued 7.23 determination applies, the name of the area. (4) In this section— continued 7.23 determination means a 7.23 determination that— (a) has been continued in force by the Act, Schedule 4, Part 1, and (b) has not been repealed as provided by that part. Note— The Act, Schedule 4, Part 1 contains other definitions that affect the interpretation of this section. 4 Complying development (1) If the land is land on which complying development may be carried out under each of the complying development codes under State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 , because of that Policy, clause 1.17A(1)(c)–(e), (2), (3) or (4), 1.18(1)(c3) or 1.19. (2) If complying development may not be carried out on the land because of 1 of those clauses, the reasons why it may not be carried out under the clause. (3) If the council does not have sufficient information to ascertain the extent to which complying development may or may not be carried out on the land, a statement that— (a) a restriction applies to the land, but it may not apply to all of the land, and (b) the council does not have sufficient information to ascertain the extent to which complying development may or may not be carried out on the land. (4) If the complying development codes are varied, under that Policy, clause 1.12, in relation to the land. 5 Exempt development (1) If the land is land on which exempt development may be carried out under each of the exempt development codes under State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 , because of that Policy, clause 1.16(1)(b1)–(d) or 1.16A. (2) If exempt development may not be carried out on the land because of 1 of those clauses, the reasons why it may not be carried out under the clause. (3) If the council does not have sufficient information to ascertain the extent to which exempt development may or may not be carried out on the land, a statement that— (a) a restriction applies to the land, but it may not apply to all of the land, and (b) the council does not have sufficient information to ascertain the extent to which exempt development may or may not be carried out on the land. (4) If the exempt development codes are varied, under that Policy, clause 1.12, in relation to the land. 6 Affected building notices and building product rectification orders (1) Whether the council is aware that— (a) an affected building notice is in force in relation to the land, or (b) a building product rectification order is in force in relation to the land that has not been fully complied with, or (c) a notice of intention to make a building product rectification order given in relation to the land is outstanding. (2) In this section— affected building notice has the same meaning as in the Building Products (Safety) Act 2017 , Part 4. building product rectification order has the same meaning as in the Building Products (Safety) Act 2017 . 7 Land reserved for acquisition Whether an environmental planning instrument or proposed environmental planning instrument referred to in section 1 makes provision in relation to the acquisition of the land by an authority of the State, as referred to in the Act, section 3.15. 8 Road widening and road realignment Whether the land is affected by road widening or road realignment under— (a) the Roads Act 1993 , Part 3, Division 2, or (b) an environmental planning instrument, or (c) a resolution of the council. 9 Flood related development controls (1) If the land or part of the land is within the flood planning area and subject to flood related development controls. (2) If the land or part of the land is between the flood planning area and the probable maximum flood and subject to flood related development controls. (3) In this section— flood planning area has the same meaning as in the Flood Risk Management Manual. Flood Risk Management Manual means the Flood Risk Management Manual , ISBN 978-1-923076-17-4 , published by the NSW Government in June 2023. probable maximum flood has the same meaning as in the Flood Risk Management Manual. 10 Council and other public authority policies on hazard risk restrictions (1) Whether any of the land is affected by an adopted policy that restricts the development of the land because of the likelihood of land slip, bush fire, tidal inundation, subsidence, acid sulfate soils, contamination, aircraft noise, salinity, coastal hazards, sea level rise or another risk, other than flooding. (2) In this section— adopted policy means a policy adopted— (a) by the council, or (b) by another public authority, if the public authority has notified the council that the policy will be included in a planning certificate issued by the council. 11 Bush fire prone land (1) If any of the land is bush fire prone land, designated by the Commissioner of the NSW Rural Fire Service under the Act, section 10.3, a statement that all or some of the land is bush fire prone land. (2) If none of the land is bush fire prone land, a statement to that effect. 12 Loose-fill asbestos insulation If the land includes residential premises, within the meaning of the Home Building Act 1989 , Part 8, Division 1A, that are listed on the Register kept under that Division, a statement to that effect. 13 Mine subsidence Whether the land is declared to be a mine subsidence district, within the meaning of the Coal Mine Subsidence Compensation Act 2017 . 14 Paper subdivision information (1) The name of a development plan adopted by a relevant authority that— (a) applies to the land, or (b) is proposed to be subject to a ballot. (2) The date of a subdivision order that applies to the land. (3) Words and expressions used in this section have the same meaning as in this Regulation, Part 10 and the Act, Schedule 7. 15 Property vegetation plans If the land is land in relation to which a property vegetation plan is approved and in force under the Native Vegetation Act 2003 , Part 4, a statement to that effect, but only if the council has been notified of the existence of the plan by the person or body that approved the plan under that Act. 16 Biodiversity stewardship sites If the land is a biodiversity stewardship site under a biodiversity stewardship agreement under the Biodiversity Conservation Act 2016 , Part 5, a statement to that effect, but only if the council has been notified of the existence of the agreement by the Biodiversity Conservation Trust. Note— Biodiversity stewardship agreements include biobanking agreements under the Threatened Species Conservation Act 1995 , Part 7A that are taken to be biodiversity stewardship agreements under the Biodiversity Conservation Act 2016 , Part 5. 17 Biodiversity certified land If the land is biodiversity certified land under the Biodiversity Conservation Act 2016 , Part 8, a statement to that effect. Note— Biodiversity certified land includes land certified under the Threatened Species Conservation Act 1995 , Part 7AA that is taken to be certified under the Biodiversity Conservation Act 2016 , Part 8. 18 Orders under Trees (Disputes Between Neighbours) Act 2006 Whether an order has been made under the Trees (Disputes Between Neighbours) Act 2006 to carry out work in relation to a tree on the land, but only if the council has been notified of the order. 19 Annual charges under Local Government Act 1993 for coastal protection services that relate to existing coastal protection works (1) If the Coastal Management Act 2016 applies to the council, whether the owner, or a previous owner, of the land has given written consent to the land being subject to annual charges under the Local Government Act 1993 , section 496B, for coastal protection services that relate to existing coastal protection works. (2) In this section— existing coastal protection works has the same meaning as in the Local Government Act 1993 , section 553B. Note— Existing coastal protection works are works to reduce the impact of coastal hazards on land, such as seawalls, revetments, groynes and beach nourishment, that existed before 1 January 2011. 20 Western Sydney Aerotropolis Whether under State Environmental Planning Policy (Precincts—Western Parkland City) 2021 , Chapter 4 the land is— (a) in an ANEF or ANEC contour of 20 or greater, as referred to in that Chapter, section 4.17, or (b) shown on the Lighting Intensity and Wind Shear Map , or (c) shown on the Obstacle Limitation Surface Map , or (d) in the “public safety area” on the Public Safety Area Map , or (e) in the “3 kilometre wildlife buffer zone” or the “13 kilometre wildlife buffer zone” on the Wildlife Buffer Zone Map . 21 Development consent conditions for seniors housing If State Environmental Planning Policy (Housing) 2021 , Chapter 3, Part 5 applies to the land, any conditions of a development consent granted after 11 October 2007 in relation to the land that are of the kind set out in that Policy, section 88(2). 22 Site compatibility certificates and development consent conditions for affordable rental housing (1) Whether there is a current site compatibility certificate under State Environmental Planning Policy (Housing) 2021 , or a former site compatibility certificate, of which the council is aware, in relation to proposed development on the land and, if there is a certificate— (a) the period for which the certificate is current, and (b) that a copy may be obtained from the Department. (2) If State Environmental Planning Policy (Housing) 2021 , Chapter 2, Part 2, Division 1 or 5 applies to the land, any conditions of a development consent in relation to the land that are of a kind referred to in that Policy, section 21(1) or 40(1). (3) Any conditions of a development consent in relation to land that are of a kind referred to in State Environmental Planning Policy (Affordable Rental Housing) 2009 , clause 17(1) or 38(1). (4) In this section— former site compatibility certificate means a site compatibility certificate issued under State Environmental Planning Policy (Affordable Rental Housing) 2009 . 23 Water or sewerage services If water or sewerage services are, or are to be, provided to the land under the Water Industry Competition Act 2006 , a statement to that effect. Note— A public water utility may not be the provider of some or all of the services to the land. If a water or sewerage service is provided to the land by a licensee under the Water Industry Competition Act 2006 , a contract for the service will be deemed to have been entered into between the licensee and the owner of the land. A register relating to approvals and licences necessary for the provision of water or sewerage services under the Water Industry Competition Act 2006 is maintained by the Independent Pricing and Regulatory Tribunal and provides information about the areas serviced, or to be serviced, under that Act. Purchasers should check the register to understand who will service the property. Outstanding charges for water or sewerage services provided under the Water Industry Competition Act 2006 become the responsibility of the purchaser. 24 Special entertainment precincts Whether the land or part of the land is in a special entertainment precinct within the meaning of the Local Government Act 1993 , section 202B. 25 Interim development in future infrastructure corridors If State Environmental Planning Policy (Transport and Infrastructure) 2021 , section 4.7A applies to the land, a condition of a development consent granted in relation to the land that is a condition of the concurrence granted by Transport for NSW under that section. sch 2: Am 2022 (40), Sch 1[50]–[54]; 2023 (547), Sch 1[5]; 2023 (602), Sch 1; 2024 (97), Sch 1[3]; 2025 (300), Sch 1[2]; 2025 (667), Sch 1.
— Not present in the earlier version —
If State Environmental Planning Policy (Transport and Infrastructure) 2021 , section 4.7A applies to the land, a condition of a development consent granted in relation to the land that is a condition of the concurrence granted by Transport for NSW under that section.
Designated development sch 3: Am 2022 (40), Sch 1[23] [25] [55]–[59]; 2022 (142), Sch 1[12]; 2022 (333), sec 3(5); 2022 (656), sec 3(3); 2022 (702), Sch 1[19]–[21]; 2022 (753), sec 3(3); 2023 No 7, Sch 2.26[2]; 2023 (620), Sch 1[2].
Designated development sch 3: Am 2022 (40), Sch 1[23] [25] [55]–[59]; 2022 (142), Sch 1[12]; 2022 (333), sec 3(5); 2022 (656), sec 3(3); 2022 (702), Sch 1[19]–[21]; 2022 (753), sec 3(3); 2023 No 7, Sch 2.26[2]; 2023 (620), Sch 1[2]; 2025 (666), Sch 1.
Development in Activation Precincts
The following development is not designated development if it is carried out on land in the Regional Enterprise Zone in the Parkes, Wagga Wagga or Moree Activation Precincts under State Environmental Planning Policy (Precincts—Regional) 2021 , Chapter 3— (a) development for the purposes of thermal electricity generating works that generate less than 50 megawatts of electrical power, (b) development of a kind specified in this Schedule, sections 3, 5–13, 16–18, 20–22, 26, 27, 29, 31, 33, 36–41 and 45–47.
— Not present in the earlier version —
(1) This section applies to the following land— (a) land in the following zones in the Moree Activation Precinct and Wagga Wagga Activation Precinct— (i) Regional Enterprise Zone, (ii) Rural Activity Zone, (iii) Zone SP2, (b) land in the following zones in the Parkes Activation Precinct— (i) Regional Enterprise Zone, (ii) Zone SP2.
— Not present in the earlier version —
(2) The following development is not designated development if the development is carried out under State Environmental Planning Policy (Precincts—Regional) 2021 , Chapter 3 on land to which this section applies— (a) development for the purposes of thermal electricity generating works that generate less than 50 MW of electrical power, (b) development of a kind specified in this schedule, sections 3, 5–13, 16–18, 20–22, 26, 27, 29, 31, 33, 36–41 and 45–47.
— Removed in the later version —
Environmental Planning and Assessment Regulation 2021 (759) . LW 17.12.2021. Date of commencement, Schs 8 and 9 excepted, 1.3.2022, sec 2(1); date of commencement of Sch 8, 1.7.2022, sec 2(2); date of commencement of Sch 9, 1.1.2022, sec 2(3). This Regulation has been amended by this Regulation, sec 298(8) and Sch 8 and as follows— 2022 (39) Environmental Planning and Assessment Amendment (Moree Activation Precinct) Regulation 2022 . LW 18.2.2022. Date of commencement, on publication on LW, sec 2. (40) Environmental Planning and Assessment Amendment Regulation 2022 . LW 18.2.2022. Date of commencement, Sch 3 excepted, on publication on LW, sec 2(1); date of commencement of Sch 3, 1.6.2022, sec 2(2) (118) Environmental Planning and Assessment Amendment (Wilton Town Centre Precinct) Regulation 2022 . LW 30.3.2022. Date of commencement, 30.6.2023, sec 2. Amended by Environmental Planning and Assessment Amendment (Wilton Town Centre Precinct) Regulation (No 2) 2022 (558) . LW 23.9.2022. Date of commencement, on publication on LW, sec 2. (142) Environmental Planning and Assessment Amendment (Miscellaneous) Regulation 2022 . LW 13.4.2022. Date of commencement, 13.4.2022, sec 2. (146) Environmental Planning and Assessment Amendment (Emergency Accommodation) Regulation 2022 . LW 14.4.2022. Date of commencement, on publication on LW, sec 2. (244) Environmental Planning and Assessment Amendment (Moorebank Freight Intermodal Precinct) Regulation 2022 . LW 27.5.2022. Date of commencement, on publication on LW, sec 2. (266) Environmental Planning and Assessment Amendment (Temporary Emergency Facilities) Regulation 2022 . LW 3.6.2022. Date of commencement, on publication on LW, sec 2. (333) Environmental Planning and Assessment Amendment (Snowy Mountains Activation Precinct) Regulation 2022 . LW 1.7.2022. Date of commencement, on publication on LW, sec 2. (448) Environmental Planning and Assessment Amendment (Housing Supply) Regulation 2022 . LW 12.8.2022. Date of commencement, on publication on LW, sec 2. (460) Environmental Planning and Assessment Amendment (Avoided Land) Regulation 2022 . LW 17.8.2022. Date of commencement, on publication on LW, sec 2. (520) Environmental Planning and Assessment Amendment (Sustainable Buildings) Regulation 2022 . LW 29.8.2022. Date of commencement, 1.10.2023, sec 2. Amended by Environmental Planning and Assessment Amendment (Sustainable Buildings) Regulation 2023 . LW 22.9.2023. Date of commencement, on publication on LW, sec 2. (530) Environmental Planning and Assessment Amendment (Notice Requirements) Regulation 2022 . LW 2.9.2022. Date of commencement, 30.6.2023, sec 2. Amended by Environmental Planning and Assessment Amendment (Miscellaneous) Regulation (No 2) 2022 (702) . LW 25.11.2022. Date of commencement, on publication on LW, sec 2. (540) Environmental Planning and Assessment Amendment (Parramatta City Centre Development Levy) Regulation 2022 . LW 9.9.2022. Date of commencement, 14.10.2022, sec 2. (579) Environmental Planning and Assessment Amendment (Conflict of Interest) Regulation 2022 . LW 30.9.2023. Date of commencement, 3.4.2023, sec 2. (621) Environmental Planning and Assessment Amendment (Water Catchments) Regulation 2022 . LW 21.10.2022. Date of commencement, 21.11.2022, sec 2. (654) Environmental Planning and Assessment Amendment (Bee Keeping and Grazing) Regulation 2022 . LW 4.11.2022. Date of commencement, 9.11.2022, sec 2. (656) Environmental Planning and Assessment Amendment (Wagga Wagga Activation Precinct) Regulation 2022 . LW 4.11.2022. Date of commencement, on publication on LW, sec 2. (702) Environmental Planning and Assessment Amendment (Miscellaneous) Regulation (No 2) 2022 . LW 25.11.2022. Date of commencement, on publication on LW, sec 2. (752) Environmental Planning and Assessment Amendment (Cumberland Plain Biodiversity Certification) Regulation 2022 . LW 9.12.2022. Date of commencement, on publication on LW, sec 2. (753) Environmental Planning and Assessment Amendment (Stage 1 Bays West Precinct) Regulation 2022 . LW 9.12.2022. Date of commencement, on publication on LW, sec 2. (789) Environmental Planning and Assessment Amendment (Activation Precincts) Regulation 2022 . LW 16.12.2022. Date of commencement, on publication on LW, sec 2. (790) Environmental Planning and Assessment Amendment (Kosciuszko Alpine Region) Regulation 2022 . LW 16.12.2022. Date of commencement, on publication on LW, sec 2. (791) Environmental Planning and Assessment Amendment (Lismore Flood Recovery) Regulation 2022 . LW 16.12.2022. Date of commencement, 13.2.2023, sec 2. 2023 (30) Environmental Planning and Assessment (Development Certification and Fire Safety) Amendment (Construction Certificates) Regulation 2023 . LW 3.2.2023. Date of commencement, on publication on LW, sec 2. (31) Environmental Planning and Assessment Amendment (Water Supply Systems) Regulation 2023 . LW 3.2.2023. Date of commencement, on publication on LW, sec 2. (67) Environmental Planning and Assessment Amendment (Dubbo) Regulation 2023 . LW 24.2.2023. Date of commencement, on publication on LW, sec 2. (71) Planning Legislation Amendment (National Construction Code) Regulation 2023 . LW 24.2.2023. Date of commencement, 1.5.2023, sec 2. (94) Environmental Planning and Assessment Amendment (Activation Precincts) Regulation 2023 . LW 2.3.2023. Date of commencement, on publication on LW, sec 2. (95) Environmental Planning and Assessment Amendment (Conflict of Interest) Regulation 2023 . LW 2.3.2023. Date of commencement, 3.4.2023, sec 2. (277) Environmental Planning and Assessment Amendment (Fees) Regulation 2023 . LW 9.6.2023. Date of commencement, on publication on LW, sec 2. (318) Environmental Planning and Assessment Amendment (Lismore City Local Planning Panel) Regulation 2023 . LW 23.6.2023. Date of commencement, on publication on LW, sec 2. (350) Environmental Planning and Assessment Amendment (NSW Planning Portal) Regulation 2023 . LW 30.6.2023. Date of commencement, on publication on LW, sec 2. No 7 Statute Law (Miscellaneous Provisions) Act 2023 . Assented to 3.7.2023. Date of commencement, 14.7.2023, sec 2. (512) Environmental Planning and Assessment Amendment (Estimated Development Cost) Regulation 2023 . LW 15.9.2023. Date of commencement, 4.3.2024, sec 2. (513) Environmental Planning and Assessment Amendment (Exceptions to Development Standards) Regulation 2023 . LW 15.9.2023. Date of commencement, 1.11.2023, sec 2. (530) Environmental Planning and Assessment Amendment (Special Contributions Areas Infrastructure Fund) Regulation 2023 . LW 22.9.2023. Date of commencement, on publication on LW, sec 2. (531) Environmental Planning and Assessment Amendment (Sustainable Buildings) Regulation 2023 . LW 22.9.2023. Date of commencement, on publication on LW, sec 2. (547) Environmental Planning and Assessment Legislation Amendment (Housing and Productivity Contributions) Regulation 2023 . LW 29.9.2023. Date of commencement, 1.10.2023, sec 2. (602) Environmental Planning and Assessment Amendment (Flood Planning) Regulation 2023 . LW 10.11.2023. Date of commencement, on publication on LW, sec 2. (620) Environmental Planning and Assessment Amendment (Snowy Mountains Activation Precinct) Regulation 2023 . LW 24.11.2023. Date of commencement, on publication on LW, sec 2. No 53 24-Hour Economy Commissioner Act 2023 . Assented to 12.12.2023. Date of commencement of Sch 4.2, 1.7.2024, sec 2(a)(iii) and 2024 (211) LW 21.6.2024. (662) Environmental Planning and Assessment Amendment (Housing) Regulation 2023 . LW 14.12.2023. Date of commencement, on publication on LW, sec 2. 2024 (97) Environmental Planning and Assessment Amendment (Schools) Regulation 2024 . LW 5.4.2024. Date of commencement, on publication on LW, sec 2. (134) Environmental Planning and Assessment Amendment (Transport Oriented Development) Regulation 2024 . LW 29.4.2024. Date of commencement, 13.5.2024, sec 2. (297) Environmental Planning and Assessment Amendment (Development Levies) Regulation 2024 . LW 12.7.2024. Date of commencement, on publication on LW, sec 2. (315) Environmental Planning and Assessment Amendment (High Speed Rail Authority) Regulation 2024 . LW 26.7.2024. Date of commencement, on publication on LW, sec 2. (325) Environmental Planning and Assessment Amendment (Consent Authority) Regulation 2024 . LW 2.8.2024. Date of commencement, on publication on LW, sec 2. (562) Environmental Planning and Assessment Amendment (Development Consents) Regulation 2024 . LW 8.11.2024. Date of commencement, on publication on LW, sec 2. (577) Environmental Planning and Assessment Amendment (Government and Non-Government Schools) Regulation 2024 . LW 22.11.2024. Date of commencement, on publication on LW, sec 2. (588) Environmental Planning and Assessment Amendment (Hornsby Transport Oriented Development Precinct) Regulation 2024 . LW 27.11.2024. Date of commencement, on publication on LW, sec 2. (589) Environmental Planning and Assessment Amendment (Macquarie Park Transport Oriented Development Precinct) Regulation 2024 . LW 27.11.2024. Date of commencement, on publication on LW, sec 2. (629) Environmental Planning and Assessment Amendment (Development Levies) Regulation (No 2) 2024 . LW 13.12.2024. Date of commencement, on publication on LW, sec 2. (630) Environmental Planning and Assessment Amendment (Sea Bed Mining and Exploration) Regulation 2024 . LW 13.12.2024. Date of commencement, 13.12.2024, sec 2 and 2024 (623) LW 13.12.2024. (631) Environmental Planning and Assessment Amendment (Temporary Housing) Regulation 2024 . LW 13.12.2024. Date of commencement, on publication on LW, sec 2. 2025 (17) Environmental Planning and Assessment (Development Certification and Fire Safety) Amendment Regulation 2025 . LW 31.1.2025. Date of commencement, 13.2.2025, sec 2. (143) Environmental Planning and Assessment Amendment (Bush Fire Protection Mechanisms) Regulation 2025 . LW 4.4.2025. Date of commencement, on publication on LW, sec 2. No 24 Environmental Planning and Assessment Amendment Act 2025 . Assented to 22.5.2025. Date of commencement of Sch 2, assent, sec 2(b). (300) Environmental Planning and Assessment Amendment (Network Operators) Regulation 2025 . LW 27.6.2025. Date of commencement of Sch 1[1] and [3], on publication on LW, sec 2(b); date of commencement of Sch 1[2], 1.7.2025, sec 2(a). (340) Environmental Planning and Assessment Amendment (Housing and Productivity Contributions Scheme) Regulation 2025 . LW 11.7.2025. Date of commencement, on publication on LW, sec 2. (354) Environmental Planning and Assessment Amendment (Pattern Book Development) Regulation 2025 . LW 16.7.2025. Date of commencement, on publication on LW, sec 2. (501) Environmental Planning and Assessment Amendment (Snowy Mountains) Regulation 2025 . LW 19.9.2025. Date of commencement, on publication on LW, sec 2. (556) Environmental Planning and Assessment Amendment (Planning Proposal Authority) Regulation 2025 . LW 17.10.2025. Date of commencement, on publication on LW, sec 2. (634) Environmental Planning and Assessment Amendment (Mid-Rise Housing Patterns) Regulation 2025 . LW 28.11.2025. Date of commencement, on publication on LW, sec 2.
— Removed in the later version —
Sec 2 Am 2022 (40), Sch 1[1]. Sec 3 Am 2022 (520), Sch 2[1]. Sec 4 Am 2023 (71), Sch 1.3[1]. Sec 6 Subst 2023 (512), Sch 1[1]. Sec 6A Ins 2023 (512), Sch 1[1]. Sec 10A Ins 2025 (556), Sch 1. Sec 15 Am 2023 (662), Sch 1[1]. Sec 23 Am 2022 (702), Sch 1[1]–[3]; 2022 (790), sec 3. Sec 26 Am 2022 (448), sec 3(1)–(3). Sec 27 Am 2023 (531), Sch 2[1]. Sec 29 Am 2022 (520), Sch 2[2]; 2023 (662), Sch 1[2]–[4]; 2025 (634), Sch 1[1]. Sec 30A Ins 2022 (460), Sch 1[1]. Am 2022 (752), Sch 1[1]. Sec 30B Ins 2022 (579), Sch 1[1]. Sec 31 Am 2022 (40), Sch 1[2]; 2022 (333), sec 3(1); 2022 (789), Sch 1[1]; 2023 (94), sec 3(1). Sec 34 Am 2022 (40), Sch 1[3]–[5]. Sec 35 Am 2022 (40), Schs 1[6]–[12], 3[1]; 2022 (118), sec 3(1) (2); 2022 (460), Sch 1[2]; 2022 (702), Sch 1[4] [5]; 2022 (753), sec 3(1) (2); 2023 (512), Sch 1[2]; 2024 (588), Sch 1[1] [2]; 2024 (589), Sch 1[1] [2]. Sec 35A Ins 2022 (40), Sch 3[2]. Sec 35B Ins 2023 (513), Sch 1[1]. Sec 35B Ins 2022 (520), Sch 2[3] (am 2023 (531), Sch 1[8]). Renumbered as sec 35BA, 2023 (662), Sch 1[5]. Sec 35BA (previously sec 35B) Renumbered 2023 (662), Sch 1[5]. Sec 35C Ins 2022 (520), Sch 2[3] (am 2023 (531), Sch 1[9] [10]). Sec 35D Ins 2022 (520), Sch 2[3] (am 2023 (531), Sch 1[11] [12]). Sec 36 Am 2023 (350), Sch 1[1]. Sec 36A Ins 2023 (350), Sch 1[1]. Sec 37 Am 2022 (142), Sch 1[1]. Sec 38 Am 2023 (350), Sch 1[2]. Sec 39 Am 2023 (350), Sch 1[2]. Sec 50 Am 2022 (40), Sch 1[13]. Sec 59 Am 2022 (142), Sch 1[1]; 2023 (350), Sch 1[1]. Sec 61 Am 2022 (39), sec 3(1) (2); 2022 (40), Sch 1[14]; 2022 (142), Sch 1[2]; 2022 (656), sec 3(1) (2); 2022 (702), Sch 1[6]; 2023 (67), sec 3(1). Sec 66 Am 2022 (40), Sch 1[15]–[17]; 2022 (142), Sch 1[3]; 2025 (501), Sch 1[1]. Sec 66A Ins 2022 (579), Sch 1[2]. Am 2023 (95), sec 4(1) (2). Sec 69 Am 2023 (30), Sch 2[1] [2]; 2023 (71), Sch 1.3[2]. Sec 79A Ins 2022 (520), Sch 2[4] (am 2023 (531), Sch 1[13]–[15]). Sec 79B Ins 2022 (520), Sch 2[4] (am 2023 (531), Sch 1[16]). Sec 80 Am 2023 (662), Sch 1[6]. Sec 81 Am 2022 (40), Sch 1[18] [19]; 2023 (662), Sch 1[7] [8]. Sec 82 Am 2022 (40), Sch 1[20]; 2023 (662), Sch 1[9]. Sec 84 Am 2022 (448), sec 3(4); 2023 (662), Sch 1[10]. Sec 86A Ins 2024 (134), Sch 1. Sec 87 Am 2022 (40), Sch 1[21] [22]; 2022 (530), Sch 1[1]. Sec 88 Am 2022 (530), Sch 1[2]. Sec 90A Ins 2023 (513), Sch 1[2]. Sec 97A Ins 2023 No 53, Sch 4.2. Subst 2024 (562), Sch 1. Sec 99 Am 2022 (142), Sch 1[1]. Sec 100 Am 2025 No 24, Sch 2[1]. Sec 101 Am 2022 (40), Sch 1[23]. Sec 102 Am 2022 (520), Sch 2[5]; 2023 (662), Sch 1[11]–[14]; 2025 (634), Sch 1[3]. Sec 103 Am 2022 (40), Sch 1[24]. Sec 103A Ins 2025 (634), Sch 1[3]. Sec 104 Am 2022 (702), Sch 1[7]; 2023 (350), Sch 1[1]. Sec 105 Am 2025 No 24, Sch 2[2]. Sec 113 Am 2022 (142), Sch 1[4]; 2023 (350), Sch 1[2]. Sec 118 Am 2022 (530), Sch 1[3] [4]. Sec 122 Am 2023 (71), Sch 1.3[3]. Sec 126 Am 2022 (40), Sch 1[22] [25]. Subst 2022 (244), Sch 1[1]. Am 2022 (789), Sch 1[2]; 2023 (94), sec 3(2); 2023 (620), Sch 1[1]; 2025 (501), Sch 1[2]. Sec 127 Am 2022 (40), Sch 1[22] [26]. Rep 2022 (244), Sch 1[1]. Ins 2022 (791), Sch 1[1]. Sec 127A Ins 2024 (631), Sch 1[1]. Sec 128 Am 2022 (40), Sch 1[27]–[29]; 2022 (702), Sch 1[8] [9]; 2024 (97), Sch 1[1] [2]. Sec 129 Am 2022 (40), Sch 1[22] [30] [31]; 2022 (244), Sch 1[2]. Sec 129A Ins 2022 (40), Sch 1[32]. Am 2022 (702), Sch 1[10]. Sec 130 Am 2023 (71), Sch 1.3[3] [4]; 2025 (354), Sch 1[1]. Sec 131 Am 2023 (531), Sch 2[2]. Sec 131A Ins 2025 (354), Sch 1[2]. Sec 133 Am 2025 (354), Sch 1[3]. Sec 134 Am 2022 (40), Sch 1[33] [34]; 2025 (354), Sch 1[4]. Sec 136 Am 2022 (702), Sch 1[11] [12]; 2025 (17), Sch 2[1]. Sec 137 Am 2022 (702), Sch 1[13]–[16]; 2022 (789), Sch 1[3]; 2023 (71), Sch 1.3[3] [5] [6]; 2023 No 7, Sch 2.26[1]; 2024 (631), Sch 1[2]; 2025 (17), Sch 2[2]. Sec 138 Am 2022 (40), Sch 1[35]–[37]; 2022 (333), sec 3(2) (3). Sec 141 Am 2022 (789), Sch 1[4]–[6]; 2023 (350), Sch 1[1]. Sec 146 Am 2023 (71), Sch 1.3[2]. Sec 155 Am 2022 (142), Sch 1[5]. Sec 157 Am 2023 (512), Sch 1[3]. Sec 169 Subst 2022 (146), sec 3. Am 2022 (266), sec 3(1); 2022 (654), sec 3(1) (2). Sec 171 Am 2022 (40), Sch 1[38]; 2022 (702), Sch 1[17]; 2023 (512), Sch 1[2]; 2024 (577), Sch 1[1]. Sec 171A Ins 2022 (621), Sch 1. Sec 173 Am 2022 (142), Sch 1[1]. Sec 175 Am 2022 (40), Sch 1[39] [40]. Sec 178A Ins 2023 (350), Sch 1[3]. Sec 179 Am 2022 (142), Sch 1[6] [7]. Sec 180 Am 2022 (142), Sch 1[8] [9]. Sec 181 Am 2022 (40), Sch 1[41]. Sec 190 Am 2021 (759), Sch 8[1]; 2022 (142), Sch 1[1]. Sec 195 Rep 2023 (350), Sch 1[4]. Sec 198 Am 2022 (40), Sch 1[42]; 2022 (702), Sch 1[18]; 2024 (577), Sch 1[3]. Part 8, Div 7 Ins 2022 (460), Sch 1[3]. Sec 201A Ins 2022 (460), Sch 1[3]. Am 2022 (752), Sch 1[1]. Sec 201B Ins 2024 (577), Sch 1[2]. Sec 206 Am 2021 (759), Sch 8[2] [3]. Sec 209 Am 2022 (540), Sch 1[1] [2]; 2023 (350), Sch 1[5]; 2024 (297), Sch 1[1] [2]; 2024 (588), Sch 1[3]; 2024 (589), Sch 1[3]; 2024 (629), Sch 1[1]–[3]. Sec 217 Am 2021 (759), Sch 8[4]. Sec 218 Am 2021 (759), Sch 8[5]–[7]. Sec 218A Ins 2021 (759), Sch 8[8]. Sec 220 Am 2021 (759), Sch 8[9] [10]. Part 9, Div 6 Ins 2023 (530), sec 3. Sec 222A Ins 2023 (530), sec 3. Am 2023 (547), Sch 1[1]–[4]. Sec 222B Ins 2024 (631), Sch 1[3]. Rep 2025 No 24, Sch 2[3]. Ins 2025 (340), Sch 1[1]. Sec 222C Ins 2025 (340), Sch 1[1]. Sec 223 Am 2022 (40), Sch 1[43]. Sec 240 Am 2022 (579), Sch 1[3]. Sec 245 Am 2023 (350), Sch 1[1]. Sec 246 Am 2022 (530), Sch 1[5]. Sec 251 Subst 2023 (512), Sch 1[4]. Sec 266 Am 2023 (512), Sch 1[5] [6]. Sec 267 Am 2023 (512), Sch 1[7]. Sec 268 Am 2022 (142), Sch 1[10]. Sec 269 Am 2022 (40), Sch 1[44] [45]. Sec 269A Ins 2022 (752), Sch 1[2]. Sec 270 Am 2023 (71), Sch 1.3[7]. Sec 271 Subst 2023 (71), Sch 1.3[8]. Am 2025 (143), Sch 1[1] [2]. Sec 272 Am 2023 (71), Sch 1.3[9]. Sec 275 Am 2024 (325), Sch 1[1]. Sec 285 Am 2023 (350), Sch 1[6]. Sec 286 Am 2023 (350), Sch 1[7]. Sec 287 Subst 2023 (350), Sch 1[8]. Sec 287A Ins 2023 (350), Sch 1[8]. Part 15, Div 4A Ins 2023 (662), Sch 1[15]. Sec 288A Ins 2023 (662), Sch 1[15]. Sec 288B Ins 2023 (662), Sch 1[15]. Sec 288C Ins 2023 (662), Sch 1[15]. Am 2025 (634), Sch 1[5]. Sec 288D Ins 2023 (662), Sch 1[15]. Sec 288E Ins 2024 (325), Sch 1[2]. Sec 291 Am 2022 (791), Sch 1[2]; 2023 (318), sec 3. Sec 298 Rep 2021 (759), sec 298(8). Ins 2022 (142), Sch 1[11]. Sec 299 Ins 2024 (630), Sch 1. Sec 300 Ins 2025 No 24, Sch 2[4]. Sch 1 Am 2022 (40), Sch 1[31] [46]–[49]; 2022 (333), sec 3(4); 2023 (31), sec 3; 2024 (315), Sch 1[1] [2]; 2024 (577), Sch 1[4]; 2025 (300), Sch 1[1]. Sch 2 Am 2022 (40), Sch 1[50]–[54]; 2023 (547), Sch 1[5]; 2023 (602), Sch 1; 2024 (97), Sch 1[3]; 2025 (300), Sch 1[2]. Sch 3 Am 2022 (40), Sch 1[23] [25] [55]–[59]; 2022 (142), Sch 1[12]; 2022 (333), sec 3(5); 2022 (656), sec 3(3); 2022 (702), Sch 1[19]–[21]; 2022 (753), sec 3(3); 2023 No 7, Sch 2.26[2]; 2023 (620), Sch 1[2]. Sch 4 Am 2022 (40), Sch 1[60] [61]; 2022 (142), Sch 1[13] [14]; 2022 (244), Sch 1[3] [4]; 2022 (752), Sch 1[3]; 2023 (277), sec 3; 2023 (512), Sch 1[8]–[15]. Sch 5 Am 2022 (40), Sch 1[62] [63]; 2022 (266), sec 3(2) (3); 2022 (789), Sch 1[7]. Sch 5A Ins 2023 (662), Sch 1[16]. Sch 6 Am 2021 (759), Sch 8[11]; 2022 (142), Sch 1[15]–[17]; 2022 (530), Sch 1[6] (am 2022 (702), Sch 2.1[2]); 2022 (702), Sch 1[22]–[24]; 2023 (30), Sch 2[3]; 2023 (67), sec 3(2); 2023 (71), Sch 1.3[12]; 2023 (95), sec 4(3); 2023 (512), Sch 1[16]; 2023 (513), Sch 1[3]; 2023 (547), Sch 1[6]; 2024 (97), Sch 1[4]; 2024 (588), Sch 1[4]; 2024 (589), Sch 1[4]; 2025 (501), Sch 1[3]. Sch 7 Am 2022 (40), Sch 1[64]–[70]; 2022 (520), Sch 2[6] (am 2023 (531), Sch 1[17] [18]); 2022 (530), Sch 1[7]; 2022 (579), Sch 1[4]; 2023 (71), Sch 1.3[10] [11]; 2023 (512), Sch 1[17]–[19]; 2023 (531), Sch 2[3]; 2023 (662), Sch 1[17]; 2024 (631), Sch 1[4]; 2025 (300), Sch 1[3]. Sch 8 Am 2022 (40), Sch 1[71] [72]. Rep 2022 (702), Sch 1[25]. Sch 9 Rep 2022 (40), Sch 1[73]. Sch 10 Rep 2022 (702), Sch 1[25].
— Removed in the later version —
For the purposes of comparison, this table shows certain provisions of the Environmental Planning and Assessment Regulation 2000 , as in force immediately before the commencement of this Regulation, and the corresponding provisions of this Regulation. See also the table of concordance for the Environmental Planning and Assessment (Development Certification and Fire Safety) Regulation 2021 , which commenced on 1 January 2022 and remade various provisions of the Environmental Planning and Assessment Regulation 2000 . Old provision New provision cl 3 Sch 7 cl 3A s 3 cl 3B s 3 cl 4 s 7 cl 7 s 4 cl 10 s 8 cl 10A s 9 cl 11 s 10 cl 12 s 11 cl 16 s 12 cl 18 s 13 cl 21 s 14 cl 21A s 15 cl 22 s 16 cl 22A s 17 cl 24 s 21 cl 25 s 18 cl 25AA s 19 cl 25AB s 20 cl 25A s 202 cl 25B s 203 cl 25C s 203 cl 25D s 204 cl 25E s 205 cl 25F s 206 cl 25G s 206 cl 25H s 206 cl 25I s 207 cl 25J s 208 cl 25K s 209 cl 25L s 210 cl 26 s 211 cl 27 s 212 cl 28 s 213 cl 31 s 214 cl 32 s 215 cl 33A s 216 cl 34 s 217 cl 35 s 218 cl 36 s 219 cl 37 s 220 cl 38 s 220 cl 39 s 162 cl 41 s 163 cl 42 s 164 cl 43 s 165 cl 44 s 166 cl 45 s 167 cl 46 s 167 cl 47 s 22 cl 48 s 255 cl 49 s 23 cl 50 ss 6, 24, 27, 29, 31 cl 50A s 30 cl 50B s 24 cl 50C s 31 cl 51 s 39, 254 cl 52 s 40, 253 cl 54 s 36 cl 55 ss 37, 38 cl 55AA ss 37, 38 cl 55A s 37, 38 cl 56 s 32 cl 56A s 293 cl 56B s 293 cl 58 s 49 cl 59 ss 50, 51 cl 60 s 52 cl 61 s 50 cl 62 s 53 cl 63 s 54 cl 64 s 55 cl 65 s 41 cl 66 s 42 cl 67 s 43 cl 68 s 44 cl 69 s 42 cl 70 s 45 cl 70AA s 46 cl 70AB s 47 cl 70AC s 48 cl 70A s 33 cl 70B s 33 cl 77 s 56 cl 78 s 58 cl 81 s 60 cl 82 s 59 cl 90 s 57 cl 92 s 61 cl 92A s 61 cl 93 s 62 cl 94 s 64 cl 94A s 63 cl 95 s 76 cl 96 s 77 cl 96A s 78 cl 97 s 67, 68 cl 97A s 75 cl 98 s 69 cl 98A s 70 cl 98B s 71 cl 98C s 72 cl 98D s 73 cl 98E s 74 cl 98EA s 80 cl 98F s 81 cl 98G s 82 cl 98H s 83 cl 98I s 84 cl 98J s 85 cl 98K s 86 cl 100 Part 4, Div 3 cl 101 Part 4, Div 3 cl 102 Part 4, Div 3 cl 105 Part 4, Div 3 cl 106 Part 4, Div 4 cl 109 Part 4, Div 4 cl 110 Part 4, Div 4 cl 111 Part 4, Div 4 cl 113 Part 4, Div 4 cl 112 Part 4, Div 4 cl 113A s 245 cl 113B Part 4, Div 4 cl 114 s 116 cl 115 Part 5, Div 1 cl 115AA Part 5, Div 1 cl 115A Part 5, Div 1 cl 117 Part 5, Div 2 cl 118 Part 5, Div 2 cl 119 Part 5, Div 2 cl 119A s 103 cl 119B s 114 cl 120 s 109 cl 121A s 104 cl 121B s 113 cl 122 s 118 cl 122A s 119 cl 122B s 119 cl 123 s 117 cl 123BA s 275 cl 123C s 276 cl 123E s 277 cl 123F s 277 cl 123G Part 12 cl 123H Part 12 cl 123I Part 12 cl 124 s 97 cl 124AA s 96 cl 124A s 79 cl 124B s 79 cl 124C s 79 cl 124D s 79 cl 124E s 278 cl 124F s 279 cl 124G s 280 cl 124H s 275 cl 124I s 277 cl 124J s 277 cl 124K s 291 cl 126 ss 6, 120, 129 cl 127 s 132 cl 128 s 127 cl 129 s 126 cl 129A s 131 cl 129AA s 132 cl 129AB s 138 cl 129B s 139 cl 129C s 140 cl 129D s 135 cl 129E s 159 cl 130AA s 133 cl 130AB s 134 cl 130 s 137, 141 cl 130A s 160 cl 131 s 142 cl 132 s 143 cl 133 s 144 cl 134 s 136 cl 136A s 146 cl 136AA s 147 cl 136AB s 148 cl 136B s 149 cl 136C s 150 cl 136D s 151 cl 136E s 152 cl 136H s 153 cl 136I s 154 cl 136J s 155 cl 136K s 156 cl 136L s 156 cl 136M s 157 cl 136N s 158 cl 137 s 161 cl 192 s 179 cl 193 s 181 cl 193A s 184 cl 193B s 182 cl 193C s 191 cl 194 s 183 cl 195 s 185 cl 196 s 186 cl 196A s 180 cl 196B s 180 cl 197 s 187 cl 198 s 188 cl 226 s 294 cl 227AA s 169 cl 228 ss 170, 171 cl 233 s 194 cl 243 s 196 cl 244D ss 197, 198 cl 244E s 198 cl 244F ss 198, 199, 200 cl 244J ss 197, 198 cl 244K s 198 cl 244L s 201 cl 244M ss 197, 198 cl 244N s 201 cl 244O s 201 cl 246A s 250 cl 246B Sch 4, Part 2 cl 247 Sch 4, Part 2 cl 248 Sch 4, Part 3 cl 249 Sch 4, Part 2 cl 250 Sch 4, Part 2 cl 251 Sch 4, Part 3 cl 252 s 254 and Sch 4, Part 3 cl 252A s 253 and Sch 4, Part 3 cl 253 s 253 and Sch 4, Part 3 cl 254 s 256 cl 255 s 251 cl 256 s 256 cl 256A s 266 cl 256B s 258 cl 256BA s 259 cl 256C s 249 cl 256D s 256 cl 256E s 256 cl 256F Sch 4, Part 5 cl 256G Sch 4, Part 5 cl 256H Sch 4, Part 5 cl 256I Sch 4, Part 5 cl 256J s 257 and Sch 4, Part 6 cl 256K s 265 and Sch 4, Part 6 cl 256KA s 261 cl 256L ss 249, 267 cl 256M Sch 4, Part 6 cl 256N s 263 cl 256O s 264 and Sch 4, Part 6 cl 256P s 251 cl 257 Sch 4, Part 7 cl 257A Sch 4, Part 7 cl 258 s 254 and Sch 4, Part 4 cl 258A Sch 4, Part 7 cl 259 s 290 and Sch 4, Part 9 cl 262 s 268 and Sch 4, Part 9 cl 262A s 269 and Sch 4, Part 8 cl 262C s 269 and Sch 4, Part 8 cl 263 ss 252, 260, 262 and Sch 4, Part 9 cl 263A s 292 cl 263B s 268 and Sch 4, Parts 5–9 cl 264 s 240 cl 265 s 241 cl 266 s 242 cl 267 s 243 cl 268Y s 223 cl 268YA s 223 cl 268Z s 224 cl 268ZA s 225 cl 268ZB s 226 cl 268ZC s 227 cl 268ZD s 228 cl 268ZE s 229 cl 268ZF s 230 cl 268ZG s 231 cl 268ZH s 232 cl 268ZI s 230 cl 268ZJ s 233 cl 268ZK s 234 cl 268ZL s 235 cl 268ZM s 236 cl 268ZN s 237 cl 268ZO s 238 cl 268ZP s 239 cl 269 s 221 cl 270 s 66 cl 270A s 66 cl 271 s 66 cl 272 Part 14 cl 273 Part 14 cl 273A Part 14 cl 274 s 35 cl 275 s 35 cl 275A s 35 cl 275B s 35 cl 275C s 35 cl 275D s 35 cl 275E s 35 cl 276 s 34 cl 277 Sch 1 cl 278 s 222 cl 279 s 290 cl 280 s 289 cl 281 s 289 cl 281A s 281 cl 281B s 283 cl 281C s 284 cl 282 s 297 cl 284 Sch 5 cl 285 s 282 cl 285A s 295 cl 285B s 296 cl 288 s 65 cl 293 s 248 cl 294 s 298 cl 295 s 285 cl 295A s 286 cl 296 Sch 6 cl 298 Sch 6 cl 298 Sch 6 cl 299 Sch 8 Sch 1, cl 1 ss 25, 26, 28 Sch 1, cl 2 s 24 Sch 1, cl 2A s 27 Sch 1, cl 2B s 27 Sch 1, cl 4 ss 121–124 and 128–131 Sch 1, cl 4A s 131 Sch 1, cl 4B s 129 Sch 1, cl 7 s 5 Sch 2, cl 2 s 172 Sch 2, cl 3 ss 173–178, 191 Sch 2, cl 4 s 174 Sch 2, cl 6 s 190 Sch 2, cl 7 ss 192, 193 Sch 3 Sch 3 Sch 3A s 72 Sch 4 Sch 2 Sch 5 Sch 5
— Removed in the later version —
— Not present in the earlier version —
— Not present in the earlier version —
Environmental Planning and Assessment Regulation 2021 (759) . LW 17.12.2021. Date of commencement, Schs 8 and 9 excepted, 1.3.2022, sec 2(1); date of commencement of Sch 8, 1.7.2022, sec 2(2); date of commencement of Sch 9, 1.1.2022, sec 2(3). This Regulation has been amended by this Regulation, sec 298(8) and Sch 8 and as follows— 2022 (39) Environmental Planning and Assessment Amendment (Moree Activation Precinct) Regulation 2022 . LW 18.2.2022. Date of commencement, on publication on LW, sec 2. (40) Environmental Planning and Assessment Amendment Regulation 2022 . LW 18.2.2022. Date of commencement, Sch 3 excepted, on publication on LW, sec 2(1); date of commencement of Sch 3, 1.6.2022, sec 2(2) (118) Environmental Planning and Assessment Amendment (Wilton Town Centre Precinct) Regulation 2022 . LW 30.3.2022. Date of commencement, 30.6.2023, sec 2. Amended by Environmental Planning and Assessment Amendment (Wilton Town Centre Precinct) Regulation (No 2) 2022 (558) . LW 23.9.2022. Date of commencement, on publication on LW, sec 2. (142) Environmental Planning and Assessment Amendment (Miscellaneous) Regulation 2022 . LW 13.4.2022. Date of commencement, 13.4.2022, sec 2. (146) Environmental Planning and Assessment Amendment (Emergency Accommodation) Regulation 2022 . LW 14.4.2022. Date of commencement, on publication on LW, sec 2. (244) Environmental Planning and Assessment Amendment (Moorebank Freight Intermodal Precinct) Regulation 2022 . LW 27.5.2022. Date of commencement, on publication on LW, sec 2. (266) Environmental Planning and Assessment Amendment (Temporary Emergency Facilities) Regulation 2022 . LW 3.6.2022. Date of commencement, on publication on LW, sec 2. (333) Environmental Planning and Assessment Amendment (Snowy Mountains Activation Precinct) Regulation 2022 . LW 1.7.2022. Date of commencement, on publication on LW, sec 2. (448) Environmental Planning and Assessment Amendment (Housing Supply) Regulation 2022 . LW 12.8.2022. Date of commencement, on publication on LW, sec 2. (460) Environmental Planning and Assessment Amendment (Avoided Land) Regulation 2022 . LW 17.8.2022. Date of commencement, on publication on LW, sec 2. (520) Environmental Planning and Assessment Amendment (Sustainable Buildings) Regulation 2022 . LW 29.8.2022. Date of commencement, 1.10.2023, sec 2. Amended by Environmental Planning and Assessment Amendment (Sustainable Buildings) Regulation 2023 . LW 22.9.2023. Date of commencement, on publication on LW, sec 2. (530) Environmental Planning and Assessment Amendment (Notice Requirements) Regulation 2022 . LW 2.9.2022. Date of commencement, 30.6.2023, sec 2. Amended by Environmental Planning and Assessment Amendment (Miscellaneous) Regulation (No 2) 2022 (702) . LW 25.11.2022. Date of commencement, on publication on LW, sec 2. (540) Environmental Planning and Assessment Amendment (Parramatta City Centre Development Levy) Regulation 2022 . LW 9.9.2022. Date of commencement, 14.10.2022, sec 2. (579) Environmental Planning and Assessment Amendment (Conflict of Interest) Regulation 2022 . LW 30.9.2023. Date of commencement, 3.4.2023, sec 2. (621) Environmental Planning and Assessment Amendment (Water Catchments) Regulation 2022 . LW 21.10.2022. Date of commencement, 21.11.2022, sec 2. (654) Environmental Planning and Assessment Amendment (Bee Keeping and Grazing) Regulation 2022 . LW 4.11.2022. Date of commencement, 9.11.2022, sec 2. (656) Environmental Planning and Assessment Amendment (Wagga Wagga Activation Precinct) Regulation 2022 . LW 4.11.2022. Date of commencement, on publication on LW, sec 2. (702) Environmental Planning and Assessment Amendment (Miscellaneous) Regulation (No 2) 2022 . LW 25.11.2022. Date of commencement, on publication on LW, sec 2. (752) Environmental Planning and Assessment Amendment (Cumberland Plain Biodiversity Certification) Regulation 2022 . LW 9.12.2022. Date of commencement, on publication on LW, sec 2. (753) Environmental Planning and Assessment Amendment (Stage 1 Bays West Precinct) Regulation 2022 . LW 9.12.2022. Date of commencement, on publication on LW, sec 2. (789) Environmental Planning and Assessment Amendment (Activation Precincts) Regulation 2022 . LW 16.12.2022. Date of commencement, on publication on LW, sec 2. (790) Environmental Planning and Assessment Amendment (Kosciuszko Alpine Region) Regulation 2022 . LW 16.12.2022. Date of commencement, on publication on LW, sec 2. (791) Environmental Planning and Assessment Amendment (Lismore Flood Recovery) Regulation 2022 . LW 16.12.2022. Date of commencement, 13.2.2023, sec 2. 2023 (30) Environmental Planning and Assessment (Development Certification and Fire Safety) Amendment (Construction Certificates) Regulation 2023 . LW 3.2.2023. Date of commencement, on publication on LW, sec 2. (31) Environmental Planning and Assessment Amendment (Water Supply Systems) Regulation 2023 . LW 3.2.2023. Date of commencement, on publication on LW, sec 2. (67) Environmental Planning and Assessment Amendment (Dubbo) Regulation 2023 . LW 24.2.2023. Date of commencement, on publication on LW, sec 2. (71) Planning Legislation Amendment (National Construction Code) Regulation 2023 . LW 24.2.2023. Date of commencement, 1.5.2023, sec 2. (94) Environmental Planning and Assessment Amendment (Activation Precincts) Regulation 2023 . LW 2.3.2023. Date of commencement, on publication on LW, sec 2. (95) Environmental Planning and Assessment Amendment (Conflict of Interest) Regulation 2023 . LW 2.3.2023. Date of commencement, 3.4.2023, sec 2. (277) Environmental Planning and Assessment Amendment (Fees) Regulation 2023 . LW 9.6.2023. Date of commencement, on publication on LW, sec 2. (318) Environmental Planning and Assessment Amendment (Lismore City Local Planning Panel) Regulation 2023 . LW 23.6.2023. Date of commencement, on publication on LW, sec 2. (350) Environmental Planning and Assessment Amendment (NSW Planning Portal) Regulation 2023 . LW 30.6.2023. Date of commencement, on publication on LW, sec 2. No 7 Statute Law (Miscellaneous Provisions) Act 2023 . Assented to 3.7.2023. Date of commencement, 14.7.2023, sec 2. (512) Environmental Planning and Assessment Amendment (Estimated Development Cost) Regulation 2023 . LW 15.9.2023. Date of commencement, 4.3.2024, sec 2. (513) Environmental Planning and Assessment Amendment (Exceptions to Development Standards) Regulation 2023 . LW 15.9.2023. Date of commencement, 1.11.2023, sec 2. (530) Environmental Planning and Assessment Amendment (Special Contributions Areas Infrastructure Fund) Regulation 2023 . LW 22.9.2023. Date of commencement, on publication on LW, sec 2. (531) Environmental Planning and Assessment Amendment (Sustainable Buildings) Regulation 2023 . LW 22.9.2023. Date of commencement, on publication on LW, sec 2. (547) Environmental Planning and Assessment Legislation Amendment (Housing and Productivity Contributions) Regulation 2023 . LW 29.9.2023. Date of commencement, 1.10.2023, sec 2. (602) Environmental Planning and Assessment Amendment (Flood Planning) Regulation 2023 . LW 10.11.2023. Date of commencement, on publication on LW, sec 2. (620) Environmental Planning and Assessment Amendment (Snowy Mountains Activation Precinct) Regulation 2023 . LW 24.11.2023. Date of commencement, on publication on LW, sec 2. No 53 24-Hour Economy Commissioner Act 2023 . Assented to 12.12.2023. Date of commencement of Sch 4.2, 1.7.2024, sec 2(a)(iii) and 2024 (211) LW 21.6.2024. (662) Environmental Planning and Assessment Amendment (Housing) Regulation 2023 . LW 14.12.2023. Date of commencement, on publication on LW, sec 2. 2024 (97) Environmental Planning and Assessment Amendment (Schools) Regulation 2024 . LW 5.4.2024. Date of commencement, on publication on LW, sec 2. (134) Environmental Planning and Assessment Amendment (Transport Oriented Development) Regulation 2024 . LW 29.4.2024. Date of commencement, 13.5.2024, sec 2. (297) Environmental Planning and Assessment Amendment (Development Levies) Regulation 2024 . LW 12.7.2024. Date of commencement, on publication on LW, sec 2. (315) Environmental Planning and Assessment Amendment (High Speed Rail Authority) Regulation 2024 . LW 26.7.2024. Date of commencement, on publication on LW, sec 2. (325) Environmental Planning and Assessment Amendment (Consent Authority) Regulation 2024 . LW 2.8.2024. Date of commencement, on publication on LW, sec 2. (562) Environmental Planning and Assessment Amendment (Development Consents) Regulation 2024 . LW 8.11.2024. Date of commencement, on publication on LW, sec 2. (577) Environmental Planning and Assessment Amendment (Government and Non-Government Schools) Regulation 2024 . LW 22.11.2024. Date of commencement, on publication on LW, sec 2. (588) Environmental Planning and Assessment Amendment (Hornsby Transport Oriented Development Precinct) Regulation 2024 . LW 27.11.2024. Date of commencement, on publication on LW, sec 2. (589) Environmental Planning and Assessment Amendment (Macquarie Park Transport Oriented Development Precinct) Regulation 2024 . LW 27.11.2024. Date of commencement, on publication on LW, sec 2. (629) Environmental Planning and Assessment Amendment (Development Levies) Regulation (No 2) 2024 . LW 13.12.2024. Date of commencement, on publication on LW, sec 2. (630) Environmental Planning and Assessment Amendment (Sea Bed Mining and Exploration) Regulation 2024 . LW 13.12.2024. Date of commencement, 13.12.2024, sec 2 and 2024 (623) LW 13.12.2024. (631) Environmental Planning and Assessment Amendment (Temporary Housing) Regulation 2024 . LW 13.12.2024. Date of commencement, on publication on LW, sec 2. 2025 (17) Environmental Planning and Assessment (Development Certification and Fire Safety) Amendment Regulation 2025 . LW 31.1.2025. Date of commencement, 13.2.2025, sec 2. (143) Environmental Planning and Assessment Amendment (Bush Fire Protection Mechanisms) Regulation 2025 . LW 4.4.2025. Date of commencement, on publication on LW, sec 2. No 24 Environmental Planning and Assessment Amendment Act 2025 . Assented to 22.5.2025. Date of commencement of Sch 2, assent, sec 2(b). (300) Environmental Planning and Assessment Amendment (Network Operators) Regulation 2025 . LW 27.6.2025. Date of commencement of Sch 1[1] and [3], on publication on LW, sec 2(b); date of commencement of Sch 1[2], 1.7.2025, sec 2(a). (340) Environmental Planning and Assessment Amendment (Housing and Productivity Contributions Scheme) Regulation 2025 . LW 11.7.2025. Date of commencement, on publication on LW, sec 2. (354) Environmental Planning and Assessment Amendment (Pattern Book Development) Regulation 2025 . LW 16.7.2025. Date of commencement, on publication on LW, sec 2. (501) Environmental Planning and Assessment Amendment (Snowy Mountains) Regulation 2025 . LW 19.9.2025. Date of commencement, on publication on LW, sec 2. (556) Environmental Planning and Assessment Amendment (Planning Proposal Authority) Regulation 2025 . LW 17.10.2025. Date of commencement, on publication on LW, sec 2. (634) Environmental Planning and Assessment Amendment (Mid-Rise Housing Patterns) Regulation 2025 . LW 28.11.2025. Date of commencement, on publication on LW, sec 2. (666) Environmental Planning and Assessment Amendment (Designated Development) Regulation 2025 . LW 12.12.2025. Date of commencement, on publication on LW, sec 2. (667) Environmental Planning and Assessment Amendment (Future Infrastructure Corridors) Regulation 2025 . LW 12.12.2025. Date of commencement, on publication on LW, sec 2.
— Not present in the earlier version —
Sec 2 Am 2022 (40), Sch 1[1]. Sec 3 Am 2022 (520), Sch 2[1]. Sec 4 Am 2023 (71), Sch 1.3[1]. Sec 6 Subst 2023 (512), Sch 1[1]. Sec 6A Ins 2023 (512), Sch 1[1]. Sec 10A Ins 2025 (556), Sch 1. Sec 15 Am 2023 (662), Sch 1[1]. Sec 23 Am 2022 (702), Sch 1[1]–[3]; 2022 (790), sec 3. Sec 26 Am 2022 (448), sec 3(1)–(3). Sec 27 Am 2023 (531), Sch 2[1]. Sec 29 Am 2022 (520), Sch 2[2]; 2023 (662), Sch 1[2]–[4]; 2025 (634), Sch 1[1]. Sec 30A Ins 2022 (460), Sch 1[1]. Am 2022 (752), Sch 1[1]. Sec 30B Ins 2022 (579), Sch 1[1]. Sec 31 Am 2022 (40), Sch 1[2]; 2022 (333), sec 3(1); 2022 (789), Sch 1[1]; 2023 (94), sec 3(1). Sec 34 Am 2022 (40), Sch 1[3]–[5]. Sec 35 Am 2022 (40), Schs 1[6]–[12], 3[1]; 2022 (118), sec 3(1) (2); 2022 (460), Sch 1[2]; 2022 (702), Sch 1[4] [5]; 2022 (753), sec 3(1) (2); 2023 (512), Sch 1[2]; 2024 (588), Sch 1[1] [2]; 2024 (589), Sch 1[1] [2]. Sec 35A Ins 2022 (40), Sch 3[2]. Sec 35B Ins 2023 (513), Sch 1[1]. Sec 35B Ins 2022 (520), Sch 2[3] (am 2023 (531), Sch 1[8]). Renumbered as sec 35BA, 2023 (662), Sch 1[5]. Sec 35BA (previously sec 35B) Renumbered 2023 (662), Sch 1[5]. Sec 35C Ins 2022 (520), Sch 2[3] (am 2023 (531), Sch 1[9] [10]). Sec 35D Ins 2022 (520), Sch 2[3] (am 2023 (531), Sch 1[11] [12]). Sec 36 Am 2023 (350), Sch 1[1]. Sec 36A Ins 2023 (350), Sch 1[1]. Sec 37 Am 2022 (142), Sch 1[1]. Sec 38 Am 2023 (350), Sch 1[2]. Sec 39 Am 2023 (350), Sch 1[2]. Sec 50 Am 2022 (40), Sch 1[13]. Sec 59 Am 2022 (142), Sch 1[1]; 2023 (350), Sch 1[1]. Sec 61 Am 2022 (39), sec 3(1) (2); 2022 (40), Sch 1[14]; 2022 (142), Sch 1[2]; 2022 (656), sec 3(1) (2); 2022 (702), Sch 1[6]; 2023 (67), sec 3(1). Sec 66 Am 2022 (40), Sch 1[15]–[17]; 2022 (142), Sch 1[3]; 2025 (501), Sch 1[1]. Sec 66A Ins 2022 (579), Sch 1[2]. Am 2023 (95), sec 4(1) (2). Sec 69 Am 2023 (30), Sch 2[1] [2]; 2023 (71), Sch 1.3[2]. Sec 79A Ins 2022 (520), Sch 2[4] (am 2023 (531), Sch 1[13]–[15]). Sec 79B Ins 2022 (520), Sch 2[4] (am 2023 (531), Sch 1[16]). Sec 80 Am 2023 (662), Sch 1[6]. Sec 81 Am 2022 (40), Sch 1[18] [19]; 2023 (662), Sch 1[7] [8]. Sec 82 Am 2022 (40), Sch 1[20]; 2023 (662), Sch 1[9]. Sec 84 Am 2022 (448), sec 3(4); 2023 (662), Sch 1[10]. Sec 86A Ins 2024 (134), Sch 1. Sec 87 Am 2022 (40), Sch 1[21] [22]; 2022 (530), Sch 1[1]. Sec 88 Am 2022 (530), Sch 1[2]. Sec 90A Ins 2023 (513), Sch 1[2]. Sec 97A Ins 2023 No 53, Sch 4.2. Subst 2024 (562), Sch 1. Sec 99 Am 2022 (142), Sch 1[1]. Sec 100 Am 2025 No 24, Sch 2[1]. Sec 101 Am 2022 (40), Sch 1[23]. Sec 102 Am 2022 (520), Sch 2[5]; 2023 (662), Sch 1[11]–[14]; 2025 (634), Sch 1[3]. Sec 103 Am 2022 (40), Sch 1[24]. Sec 103A Ins 2025 (634), Sch 1[3]. Sec 104 Am 2022 (702), Sch 1[7]; 2023 (350), Sch 1[1]. Sec 105 Am 2025 No 24, Sch 2[2]. Sec 113 Am 2022 (142), Sch 1[4]; 2023 (350), Sch 1[2]. Sec 118 Am 2022 (530), Sch 1[3] [4]. Sec 122 Am 2023 (71), Sch 1.3[3]. Sec 126 Am 2022 (40), Sch 1[22] [25]. Subst 2022 (244), Sch 1[1]. Am 2022 (789), Sch 1[2]; 2023 (94), sec 3(2); 2023 (620), Sch 1[1]; 2025 (501), Sch 1[2]. Sec 127 Am 2022 (40), Sch 1[22] [26]. Rep 2022 (244), Sch 1[1]. Ins 2022 (791), Sch 1[1]. Sec 127A Ins 2024 (631), Sch 1[1]. Sec 128 Am 2022 (40), Sch 1[27]–[29]; 2022 (702), Sch 1[8] [9]; 2024 (97), Sch 1[1] [2]. Sec 129 Am 2022 (40), Sch 1[22] [30] [31]; 2022 (244), Sch 1[2]. Sec 129A Ins 2022 (40), Sch 1[32]. Am 2022 (702), Sch 1[10]. Sec 130 Am 2023 (71), Sch 1.3[3] [4]; 2025 (354), Sch 1[1]. Sec 131 Am 2023 (531), Sch 2[2]. Sec 131A Ins 2025 (354), Sch 1[2]. Sec 133 Am 2025 (354), Sch 1[3]. Sec 134 Am 2022 (40), Sch 1[33] [34]; 2025 (354), Sch 1[4]. Sec 136 Am 2022 (702), Sch 1[11] [12]; 2025 (17), Sch 2[1]. Sec 137 Am 2022 (702), Sch 1[13]–[16]; 2022 (789), Sch 1[3]; 2023 (71), Sch 1.3[3] [5] [6]; 2023 No 7, Sch 2.26[1]; 2024 (631), Sch 1[2]; 2025 (17), Sch 2[2]. Sec 138 Am 2022 (40), Sch 1[35]–[37]; 2022 (333), sec 3(2) (3). Sec 141 Am 2022 (789), Sch 1[4]–[6]; 2023 (350), Sch 1[1]. Sec 146 Am 2023 (71), Sch 1.3[2]. Sec 155 Am 2022 (142), Sch 1[5]. Sec 157 Am 2023 (512), Sch 1[3]. Sec 169 Subst 2022 (146), sec 3. Am 2022 (266), sec 3(1); 2022 (654), sec 3(1) (2). Sec 171 Am 2022 (40), Sch 1[38]; 2022 (702), Sch 1[17]; 2023 (512), Sch 1[2]; 2024 (577), Sch 1[1]. Sec 171A Ins 2022 (621), Sch 1. Sec 173 Am 2022 (142), Sch 1[1]. Sec 175 Am 2022 (40), Sch 1[39] [40]. Sec 178A Ins 2023 (350), Sch 1[3]. Sec 179 Am 2022 (142), Sch 1[6] [7]. Sec 180 Am 2022 (142), Sch 1[8] [9]. Sec 181 Am 2022 (40), Sch 1[41]. Sec 190 Am 2021 (759), Sch 8[1]; 2022 (142), Sch 1[1]. Sec 195 Rep 2023 (350), Sch 1[4]. Sec 198 Am 2022 (40), Sch 1[42]; 2022 (702), Sch 1[18]; 2024 (577), Sch 1[3]. Part 8, Div 7 Ins 2022 (460), Sch 1[3]. Sec 201A Ins 2022 (460), Sch 1[3]. Am 2022 (752), Sch 1[1]. Sec 201B Ins 2024 (577), Sch 1[2]. Sec 206 Am 2021 (759), Sch 8[2] [3]. Sec 209 Am 2022 (540), Sch 1[1] [2]; 2023 (350), Sch 1[5]; 2024 (297), Sch 1[1] [2]; 2024 (588), Sch 1[3]; 2024 (589), Sch 1[3]; 2024 (629), Sch 1[1]–[3]. Sec 217 Am 2021 (759), Sch 8[4]. Sec 218 Am 2021 (759), Sch 8[5]–[7]. Sec 218A Ins 2021 (759), Sch 8[8]. Sec 220 Am 2021 (759), Sch 8[9] [10]. Part 9, Div 6 Ins 2023 (530), sec 3. Sec 222A Ins 2023 (530), sec 3. Am 2023 (547), Sch 1[1]–[4]. Sec 222B Ins 2024 (631), Sch 1[3]. Rep 2025 No 24, Sch 2[3]. Ins 2025 (340), Sch 1[1]. Sec 222C Ins 2025 (340), Sch 1[1]. Sec 223 Am 2022 (40), Sch 1[43]. Sec 240 Am 2022 (579), Sch 1[3]. Sec 245 Am 2023 (350), Sch 1[1]. Sec 246 Am 2022 (530), Sch 1[5]. Sec 251 Subst 2023 (512), Sch 1[4]. Sec 266 Am 2023 (512), Sch 1[5] [6]. Sec 267 Am 2023 (512), Sch 1[7]. Sec 268 Am 2022 (142), Sch 1[10]. Sec 269 Am 2022 (40), Sch 1[44] [45]. Sec 269A Ins 2022 (752), Sch 1[2]. Sec 270 Am 2023 (71), Sch 1.3[7]. Sec 271 Subst 2023 (71), Sch 1.3[8]. Am 2025 (143), Sch 1[1] [2]. Sec 272 Am 2023 (71), Sch 1.3[9]. Sec 275 Am 2024 (325), Sch 1[1]. Sec 285 Am 2023 (350), Sch 1[6]. Sec 286 Am 2023 (350), Sch 1[7]. Sec 287 Subst 2023 (350), Sch 1[8]. Sec 287A Ins 2023 (350), Sch 1[8]. Part 15, Div 4A Ins 2023 (662), Sch 1[15]. Sec 288A Ins 2023 (662), Sch 1[15]. Sec 288B Ins 2023 (662), Sch 1[15]. Sec 288C Ins 2023 (662), Sch 1[15]. Am 2025 (634), Sch 1[5]. Sec 288D Ins 2023 (662), Sch 1[15]. Sec 288E Ins 2024 (325), Sch 1[2]. Sec 291 Am 2022 (791), Sch 1[2]; 2023 (318), sec 3. Sec 298 Rep 2021 (759), sec 298(8). Ins 2022 (142), Sch 1[11]. Sec 299 Ins 2024 (630), Sch 1. Sec 300 Ins 2025 No 24, Sch 2[4]. Sch 1 Am 2022 (40), Sch 1[31] [46]–[49]; 2022 (333), sec 3(4); 2023 (31), sec 3; 2024 (315), Sch 1[1] [2]; 2024 (577), Sch 1[4]; 2025 (300), Sch 1[1]. Sch 2 Am 2022 (40), Sch 1[50]–[54]; 2023 (547), Sch 1[5]; 2023 (602), Sch 1; 2024 (97), Sch 1[3]; 2025 (300), Sch 1[2]; 2025 (667), Sch 1. Sch 3 Am 2022 (40), Sch 1[23] [25] [55]–[59]; 2022 (142), Sch 1[12]; 2022 (333), sec 3(5); 2022 (656), sec 3(3); 2022 (702), Sch 1[19]–[21]; 2022 (753), sec 3(3); 2023 No 7, Sch 2.26[2]; 2023 (620), Sch 1[2]; 2025 (666), Sch 1. Sch 4 Am 2022 (40), Sch 1[60] [61]; 2022 (142), Sch 1[13] [14]; 2022 (244), Sch 1[3] [4]; 2022 (752), Sch 1[3]; 2023 (277), sec 3; 2023 (512), Sch 1[8]–[15]. Sch 5 Am 2022 (40), Sch 1[62] [63]; 2022 (266), sec 3(2) (3); 2022 (789), Sch 1[7]. Sch 5A Ins 2023 (662), Sch 1[16]. Sch 6 Am 2021 (759), Sch 8[11]; 2022 (142), Sch 1[15]–[17]; 2022 (530), Sch 1[6] (am 2022 (702), Sch 2.1[2]); 2022 (702), Sch 1[22]–[24]; 2023 (30), Sch 2[3]; 2023 (67), sec 3(2); 2023 (71), Sch 1.3[12]; 2023 (95), sec 4(3); 2023 (512), Sch 1[16]; 2023 (513), Sch 1[3]; 2023 (547), Sch 1[6]; 2024 (97), Sch 1[4]; 2024 (588), Sch 1[4]; 2024 (589), Sch 1[4]; 2025 (501), Sch 1[3]. Sch 7 Am 2022 (40), Sch 1[64]–[70]; 2022 (520), Sch 2[6] (am 2023 (531), Sch 1[17] [18]); 2022 (530), Sch 1[7]; 2022 (579), Sch 1[4]; 2023 (71), Sch 1.3[10] [11]; 2023 (512), Sch 1[17]–[19]; 2023 (531), Sch 2[3]; 2023 (662), Sch 1[17]; 2024 (631), Sch 1[4]; 2025 (300), Sch 1[3]. Sch 8 Am 2022 (40), Sch 1[71] [72]. Rep 2022 (702), Sch 1[25]. Sch 9 Rep 2022 (40), Sch 1[73]. Sch 10 Rep 2022 (702), Sch 1[25].
— Not present in the earlier version —
For the purposes of comparison, this table shows certain provisions of the Environmental Planning and Assessment Regulation 2000 , as in force immediately before the commencement of this Regulation, and the corresponding provisions of this Regulation. See also the table of concordance for the Environmental Planning and Assessment (Development Certification and Fire Safety) Regulation 2021 , which commenced on 1 January 2022 and remade various provisions of the Environmental Planning and Assessment Regulation 2000 . Old provision New provision cl 3 Sch 7 cl 3A s 3 cl 3B s 3 cl 4 s 7 cl 7 s 4 cl 10 s 8 cl 10A s 9 cl 11 s 10 cl 12 s 11 cl 16 s 12 cl 18 s 13 cl 21 s 14 cl 21A s 15 cl 22 s 16 cl 22A s 17 cl 24 s 21 cl 25 s 18 cl 25AA s 19 cl 25AB s 20 cl 25A s 202 cl 25B s 203 cl 25C s 203 cl 25D s 204 cl 25E s 205 cl 25F s 206 cl 25G s 206 cl 25H s 206 cl 25I s 207 cl 25J s 208 cl 25K s 209 cl 25L s 210 cl 26 s 211 cl 27 s 212 cl 28 s 213 cl 31 s 214 cl 32 s 215 cl 33A s 216 cl 34 s 217 cl 35 s 218 cl 36 s 219 cl 37 s 220 cl 38 s 220 cl 39 s 162 cl 41 s 163 cl 42 s 164 cl 43 s 165 cl 44 s 166 cl 45 s 167 cl 46 s 167 cl 47 s 22 cl 48 s 255 cl 49 s 23 cl 50 ss 6, 24, 27, 29, 31 cl 50A s 30 cl 50B s 24 cl 50C s 31 cl 51 s 39, 254 cl 52 s 40, 253 cl 54 s 36 cl 55 ss 37, 38 cl 55AA ss 37, 38 cl 55A s 37, 38 cl 56 s 32 cl 56A s 293 cl 56B s 293 cl 58 s 49 cl 59 ss 50, 51 cl 60 s 52 cl 61 s 50 cl 62 s 53 cl 63 s 54 cl 64 s 55 cl 65 s 41 cl 66 s 42 cl 67 s 43 cl 68 s 44 cl 69 s 42 cl 70 s 45 cl 70AA s 46 cl 70AB s 47 cl 70AC s 48 cl 70A s 33 cl 70B s 33 cl 77 s 56 cl 78 s 58 cl 81 s 60 cl 82 s 59 cl 90 s 57 cl 92 s 61 cl 92A s 61 cl 93 s 62 cl 94 s 64 cl 94A s 63 cl 95 s 76 cl 96 s 77 cl 96A s 78 cl 97 s 67, 68 cl 97A s 75 cl 98 s 69 cl 98A s 70 cl 98B s 71 cl 98C s 72 cl 98D s 73 cl 98E s 74 cl 98EA s 80 cl 98F s 81 cl 98G s 82 cl 98H s 83 cl 98I s 84 cl 98J s 85 cl 98K s 86 cl 100 Part 4, Div 3 cl 101 Part 4, Div 3 cl 102 Part 4, Div 3 cl 105 Part 4, Div 3 cl 106 Part 4, Div 4 cl 109 Part 4, Div 4 cl 110 Part 4, Div 4 cl 111 Part 4, Div 4 cl 113 Part 4, Div 4 cl 112 Part 4, Div 4 cl 113A s 245 cl 113B Part 4, Div 4 cl 114 s 116 cl 115 Part 5, Div 1 cl 115AA Part 5, Div 1 cl 115A Part 5, Div 1 cl 117 Part 5, Div 2 cl 118 Part 5, Div 2 cl 119 Part 5, Div 2 cl 119A s 103 cl 119B s 114 cl 120 s 109 cl 121A s 104 cl 121B s 113 cl 122 s 118 cl 122A s 119 cl 122B s 119 cl 123 s 117 cl 123BA s 275 cl 123C s 276 cl 123E s 277 cl 123F s 277 cl 123G Part 12 cl 123H Part 12 cl 123I Part 12 cl 124 s 97 cl 124AA s 96 cl 124A s 79 cl 124B s 79 cl 124C s 79 cl 124D s 79 cl 124E s 278 cl 124F s 279 cl 124G s 280 cl 124H s 275 cl 124I s 277 cl 124J s 277 cl 124K s 291 cl 126 ss 6, 120, 129 cl 127 s 132 cl 128 s 127 cl 129 s 126 cl 129A s 131 cl 129AA s 132 cl 129AB s 138 cl 129B s 139 cl 129C s 140 cl 129D s 135 cl 129E s 159 cl 130AA s 133 cl 130AB s 134 cl 130 s 137, 141 cl 130A s 160 cl 131 s 142 cl 132 s 143 cl 133 s 144 cl 134 s 136 cl 136A s 146 cl 136AA s 147 cl 136AB s 148 cl 136B s 149 cl 136C s 150 cl 136D s 151 cl 136E s 152 cl 136H s 153 cl 136I s 154 cl 136J s 155 cl 136K s 156 cl 136L s 156 cl 136M s 157 cl 136N s 158 cl 137 s 161 cl 192 s 179 cl 193 s 181 cl 193A s 184 cl 193B s 182 cl 193C s 191 cl 194 s 183 cl 195 s 185 cl 196 s 186 cl 196A s 180 cl 196B s 180 cl 197 s 187 cl 198 s 188 cl 226 s 294 cl 227AA s 169 cl 228 ss 170, 171 cl 233 s 194 cl 243 s 196 cl 244D ss 197, 198 cl 244E s 198 cl 244F ss 198, 199, 200 cl 244J ss 197, 198 cl 244K s 198 cl 244L s 201 cl 244M ss 197, 198 cl 244N s 201 cl 244O s 201 cl 246A s 250 cl 246B Sch 4, Part 2 cl 247 Sch 4, Part 2 cl 248 Sch 4, Part 3 cl 249 Sch 4, Part 2 cl 250 Sch 4, Part 2 cl 251 Sch 4, Part 3 cl 252 s 254 and Sch 4, Part 3 cl 252A s 253 and Sch 4, Part 3 cl 253 s 253 and Sch 4, Part 3 cl 254 s 256 cl 255 s 251 cl 256 s 256 cl 256A s 266 cl 256B s 258 cl 256BA s 259 cl 256C s 249 cl 256D s 256 cl 256E s 256 cl 256F Sch 4, Part 5 cl 256G Sch 4, Part 5 cl 256H Sch 4, Part 5 cl 256I Sch 4, Part 5 cl 256J s 257 and Sch 4, Part 6 cl 256K s 265 and Sch 4, Part 6 cl 256KA s 261 cl 256L ss 249, 267 cl 256M Sch 4, Part 6 cl 256N s 263 cl 256O s 264 and Sch 4, Part 6 cl 256P s 251 cl 257 Sch 4, Part 7 cl 257A Sch 4, Part 7 cl 258 s 254 and Sch 4, Part 4 cl 258A Sch 4, Part 7 cl 259 s 290 and Sch 4, Part 9 cl 262 s 268 and Sch 4, Part 9 cl 262A s 269 and Sch 4, Part 8 cl 262C s 269 and Sch 4, Part 8 cl 263 ss 252, 260, 262 and Sch 4, Part 9 cl 263A s 292 cl 263B s 268 and Sch 4, Parts 5–9 cl 264 s 240 cl 265 s 241 cl 266 s 242 cl 267 s 243 cl 268Y s 223 cl 268YA s 223 cl 268Z s 224 cl 268ZA s 225 cl 268ZB s 226 cl 268ZC s 227 cl 268ZD s 228 cl 268ZE s 229 cl 268ZF s 230 cl 268ZG s 231 cl 268ZH s 232 cl 268ZI s 230 cl 268ZJ s 233 cl 268ZK s 234 cl 268ZL s 235 cl 268ZM s 236 cl 268ZN s 237 cl 268ZO s 238 cl 268ZP s 239 cl 269 s 221 cl 270 s 66 cl 270A s 66 cl 271 s 66 cl 272 Part 14 cl 273 Part 14 cl 273A Part 14 cl 274 s 35 cl 275 s 35 cl 275A s 35 cl 275B s 35 cl 275C s 35 cl 275D s 35 cl 275E s 35 cl 276 s 34 cl 277 Sch 1 cl 278 s 222 cl 279 s 290 cl 280 s 289 cl 281 s 289 cl 281A s 281 cl 281B s 283 cl 281C s 284 cl 282 s 297 cl 284 Sch 5 cl 285 s 282 cl 285A s 295 cl 285B s 296 cl 288 s 65 cl 293 s 248 cl 294 s 298 cl 295 s 285 cl 295A s 286 cl 296 Sch 6 cl 298 Sch 6 cl 298 Sch 6 cl 299 Sch 8 Sch 1, cl 1 ss 25, 26, 28 Sch 1, cl 2 s 24 Sch 1, cl 2A s 27 Sch 1, cl 2B s 27 Sch 1, cl 4 ss 121–124 and 128–131 Sch 1, cl 4A s 131 Sch 1, cl 4B s 129 Sch 1, cl 7 s 5 Sch 2, cl 2 s 172 Sch 2, cl 3 ss 173–178, 191 Sch 2, cl 4 s 174 Sch 2, cl 6 s 190 Sch 2, cl 7 ss 192, 193 Sch 3 Sch 3 Sch 3A s 72 Sch 4 Sch 2 Sch 5 Sch 5