Changes commencing July 11th, 2025
Comparing the consolidation as at June 20th, 2025 with July 11th, 2025 · 15 changes
Interpretation s 3.34: Am 2022 (517), Sch 1[6]; 2022 (727), Sch 1[31] [32]; 2022 (742), Sch 1[15]; 2024 (115), Sch 1[5]; 2024 (585), Sch 1[15] [16].
Interpretation s 3.34: Am 2022 (517), Sch 1[6]; 2022 (727), Sch 1[31] [32]; 2022 (742), Sch 1[15]; 2024 (115), Sch 1[5]; 2024 (585), Sch 1[15] [16]; 2025 (352), Sch 1[1] [2].
(1) In this Part— approved government school means a school that is— (a) an approved school, and (b) a government school. approved school means a school for which development consent has been granted, other than an existing school. design guide means the Design Guide for Schools published by the Government Architect in May 2018. government school has the same meaning as in the Education Act 1990 . non-government school has the same meaning as in the Education Act 1990 . prescribed zone means any of the following land use zones— (a) Zone RU2 Rural Landscape, (b) Zone RU4 Primary Production Small Lots, (c) Zone RU5 Village, (d) Zone RU6 Transition, (e) Zone R1 General Residential, (f) Zone R2 Low Density Residential, (g) Zone R3 Medium Density Residential, (h) Zone R4 High Density Residential, (i) Zone R5 Large Lot Residential, (i1) Zone E1 Local Centre, (i2) Zone E2 Commercial Centre, (i3) Zone E3 Productivity Support, (i4) Zone MU1 Mixed Use, (j) Zone B1 Neighbourhood Centre, (k) Zone B2 Local Centre, (l) Zone B3 Commercial Core, (m) Zone B4 Mixed Use, (n) Zone B5 Business Development, (o) Zone B6 Enterprise Corridor, (p) Zone B7 Business Park, (q) Zone B8 Metropolitan Centre, (r) Zone SP1 Special Activities, (s) Zone SP2 Infrastructure, (s1) Zone SP4 Enterprise under the following local environmental plans— (i) Canada Bay Local Environmental Plan 2013 , (ii) Central Coast Local Environmental Plan 2022 , (iii) Penrith Local Environmental Plan 2010 , (iv) Pittwater Local Environmental Plan 2014 , (v) Port Macquarie-Hastings Local Environmental Plan 2011 , (vi) Sutherland Shire Local Environmental Plan 2015 , (vii) The Hills Local Environmental Plan 2019 , (viii) Warringah Local Environmental Plan 2011 , (s2) Zone SP5 Metropolitan Centre, (t) Zone C4 Environmental Living, (u) the following zones under State Environmental Planning Policy (Precincts—Western Parkland City) 2021 — (i) Employment (ii) Tourism, (iii) Urban, (iv) 1 Urban Development. relevant preschool means a centre-based child care facility that provides only preschool care for children who are 3–5 years of age.
Based on content from the New South Wales Legislation website sourced at 2025-07-11. For the latest information on New South Wales Government legislation please go to https://www.legislation.nsw.gov.au.
This is an unofficial reproduction provided for convenience. It is not the official version of the legislation. For the official, in-force version, see legislation.nsw.gov.au.
(1) In this Part— approved government school means a school that is— (a) an approved school, and (b) a government school. approved school means a school for which development consent has been granted, other than an existing school. campervan has the same meaning as in the Local Government (Manufactured Home Estates, Caravan Parks, Camping Grounds and Moveable Dwellings) Regulation 2021 . caravan has the same meaning as in the Local Government (Manufactured Home Estates, Caravan Parks, Camping Grounds and Moveable Dwellings) Regulation 2021 . design guide means the Design Guide for Schools published by the Government Architect NSW in May 2025. government school has the same meaning as in the Education Act 1990 . moveable dwelling has the same meaning as in the Local Government Act 1993 , but does not include a campervan, caravan or tent. non-government school has the same meaning as in the Education Act 1990 . prescribed zone means any of the following land use zones— (a) Zone RU2 Rural Landscape, (b) Zone RU4 Primary Production Small Lots, (c) Zone RU5 Village, (d) Zone RU6 Transition, (e) Zone R1 General Residential, (f) Zone R2 Low Density Residential, (g) Zone R3 Medium Density Residential, (h) Zone R4 High Density Residential, (i) Zone R5 Large Lot Residential, (i1) Zone E1 Local Centre, (i2) Zone E2 Commercial Centre, (i3) Zone E3 Productivity Support, (i4) Zone MU1 Mixed Use, (j) Zone B1 Neighbourhood Centre, (k) Zone B2 Local Centre, (l) Zone B3 Commercial Core, (m) Zone B4 Mixed Use, (n) Zone B5 Business Development, (o) Zone B6 Enterprise Corridor, (p) Zone B7 Business Park, (q) Zone B8 Metropolitan Centre, (r) Zone SP1 Special Activities, (s) Zone SP2 Infrastructure, (s1) Zone SP4 Enterprise under the following local environmental plans— (i) Canada Bay Local Environmental Plan 2013 , (ii) Central Coast Local Environmental Plan 2022 , (iii) Penrith Local Environmental Plan 2010 , (iv) Pittwater Local Environmental Plan 2014 , (v) Port Macquarie-Hastings Local Environmental Plan 2011 , (vi) Sutherland Shire Local Environmental Plan 2015 , (vii) The Hills Local Environmental Plan 2019 , (viii) Warringah Local Environmental Plan 2011 , (s2) Zone SP5 Metropolitan Centre, (t) Zone C4 Environmental Living, (u) the following zones under State Environmental Planning Policy (Precincts—Western Parkland City) 2021 — (i) Employment (ii) Tourism, (iii) Urban, (iv) 1 Urban Development. relevant preschool means a centre-based child care facility that provides only preschool care for children who are 3–5 years of age. staff accommodation , for a school, means the following if used for the accommodation of staff employed to work at the school— (a) residential accommodation, (b) moveable dwellings. stakeholder and community participation plan means the Stakeholder and Community Participation Plan published by the Department of Education in October 2024.
Existing or approved government schools—development permitted without consent Note. Section 100B(3) of the Rural Fires Act 1997 requires a person to obtain a bush fire safety authority under that Act before developing bush fire prone land for a special fire protection purpose such as a school. s 3.37: Am 2022 (742), Sch 1[16]; 2024 (585), Sch 1[17]–[26].
Existing or approved government schools—development permitted without consent Note. Section 100B(3) of the Rural Fires Act 1997 requires a person to obtain a bush fire safety authority under that Act before developing bush fire prone land for a special fire protection purpose such as a school. s 3.37: Am 2022 (742), Sch 1[16]; 2024 (585), Sch 1[17]–[26]; 2025 (352), Sch 1[3] [4].
(1) Development for any of the following purposes may be carried out by or on behalf of a public authority without development consent on land within the boundaries of an existing or approved government school— (a) construction, operation or maintenance of any of the following— (i) a library or an administration building, (ii) a portable classroom, including a modular or prefabricated classroom, (iii) a permanent classroom, (iv) a kiosk or shop selling school-related goods to students and staff, such as books, stationery or school uniforms, (v) a cafeteria or canteen carried out in accordance with AS 4674—2004 Design, construction and fit-out of food premises , (vi) a car park, (vii) a building to be used for the purposes of a relevant preschool, (viii) a hall with an associated covered outdoor learning area or kiosk, (ix) a sporting field or any type of court used for sports that uses synthetic turf, (b) minor alterations or additions, such as— (i) internal fitouts, or (ii) alterations or additions to address work health and safety requirements or to provide access for people with a disability, or (iii) alterations or additions to the external facade of a building that do not increase the building envelope (for example, porticos, balcony enclosures or covered walkways), (c) restoration, replacement or repair of damaged buildings or structures, (d) security measures, including fencing, lighting and security cameras, (e) demolition of structures or buildings (unless a State heritage item or local heritage item), (f) if the land is in a prescribed zone—construction, operation or maintenance of a building associated with the operation of the school.
(1) Development for any of the following purposes may be carried out by or on behalf of a public authority without development consent on land within the boundaries of an existing or approved government school— (a) construction, operation or maintenance of any of the following— (i) a library or an administration building, (ii) a portable classroom, including a modular or prefabricated classroom, (iii) a permanent classroom, (iv) a kiosk or shop selling school-related goods to students and staff, such as books, stationery or school uniforms, (v) a cafeteria or canteen carried out in accordance with AS 4674—2004 Design, construction and fit-out of food premises , (vi) a car park, (vii) a building to be used for the purposes of a relevant preschool, (viii) a hall with an associated covered outdoor learning area or kiosk, (ix) a sporting field or any type of court used for sports that uses synthetic turf, (x) staff accommodation, (b) minor alterations or additions, such as— (i) internal fitouts, or (ii) alterations or additions to address work health and safety requirements or to provide access for people with a disability, or (iii) alterations or additions to the external facade of a building that do not increase the building envelope (for example, porticos, balcony enclosures or covered walkways), (c) restoration, replacement or repair of damaged buildings or structures, (d) security measures, including fencing, lighting and security cameras, (e) demolition of structures or buildings (unless a State heritage item or local heritage item), (f) if the land is in a prescribed zone—construction, operation or maintenance of a building associated with the operation of the school.
(4) Nothing in this section authorises the carrying out of development in contravention of any existing condition of the development consent currently operating (other than a complying development certificate) that applies to any part of the school, relating to hours of operation, noise, vehicular movement, traffic generation, loading, waste management or landscaping.
— Removed in the later version —
New government schools—development permitted without consent s 3.37A: Ins 2024 (585), Sch 1[28].
New government schools—development permitted without consent s 3.37A: Ins 2024 (585), Sch 1[28]. Am 2025 (352), Sch 1[5].
(4) In this section— government school includes a relevant preschool.
(4) In this section— government school includes the following— (a) a relevant preschool, (b) staff accommodation.
Design quality principles in schools—Chapter 3
sch 8, hdg: Subst 2022 (248), Sch 1[9]; 2024 (585), Sch 1[43]. 1 Responsive to context Schools should be designed to respond to and enhance the positive qualities of their surroundings. In designing built forms and landscapes, consideration should be given to a Country-centred approach and respond to site conditions such as orientation, topography, natural systems, Aboriginal and European cultural heritage and the impacts of climate change. Landscapes should be integrated into the overall design to improve amenity and to help mitigate negative impacts on the streetscape and neighbouring sites. 2 Sustainable, efficient and resilient Good school design combines positive environmental, social and economic outcomes and should align with the principles of caring for Country. Schools should be designed to be durable and resilient in an evolving climate. Schools and their grounds should be designed to minimise the consumption of energy, water and other natural resources and reduce waste. 3 Accessible and inclusive School buildings and grounds should be welcoming, easy to navigate and accessible and inclusive for people with differing needs and abilities. Schools should be designed to respond to the needs of children of different ages and developmental stages, foster a sense of belonging and seek to reflect the cultural diversity of the student body and community. Schools should be designed to enable sharing of facilities with the community and to cater for activities outside of school hours. 4 Healthy and safe Good school design should support wellbeing by creating healthy internal and external environments. The design should ensure safety and security within the school boundaries, while maintaining a welcoming address and accessible environment. In designing schools, consideration should be given to connections, transport networks and safe routes for travel to and from school. 5 Functional and comfortable Schools should have comfortable and engaging spaces that are accessible for a wide range of formal and informal educational and community activities. In designing schools, consideration should be given to the amenity of adjacent development, access to sunlight, natural ventilation, proximity to vegetation and landscape, outlook and visual and acoustic privacy. Schools should include appropriate indoor and outdoor learning and play spaces, access to services and adequate storage. 6 Flexible and adaptable In designing schools, consideration should be given to future needs and take a long-term approach that is informed by site-wide strategic and spatial planning. Good design for schools should deliver high environmental performance and ease of adaptation, and maximise multi-use facilities. Schools should be adaptable to evolving teaching methods, future growth and changes in climate, and should minimise the environmental impact of the school across its life cycle. 7 Visual appeal School buildings and their landscape settings should be aesthetically pleasing by achieving good proportions and a balanced composition of built and natural elements. Schools should be designed to respond to and have a positive impact on streetscape amenity and the quality and character of the neighbourhood. The identity and street presence of schools should respond to the existing or desired future character of their locations. The design of schools should reflect the school’s civic role and community significance. sch 8: Subst 2024 (585), Sch 1[43].
Design quality principles in schools—Chapter 3 sch 8, hdg: Subst 2022 (248), Sch 1[9]; 2024 (585), Sch 1[43]. 1 Responsive to context Schools should be designed to respond to and enhance the positive qualities of their surroundings. In designing built forms and landscapes, consideration should be given to a Country-centred approach and respond to site conditions such as orientation, topography, natural systems, Aboriginal and European cultural heritage and the impacts of climate change. Landscapes should be integrated into the overall design to improve amenity and to help mitigate negative impacts on the streetscape and neighbouring sites. 2 Sustainable, efficient and resilient Good school design combines positive environmental, social and economic outcomes and should align with the principles of caring for Country. Schools should be designed to be durable and resilient in an evolving climate. Schools and their grounds should be designed to minimise the consumption of energy, water and other natural resources and reduce waste. 3 Accessible and inclusive School buildings and grounds should be welcoming, easy to navigate and accessible and inclusive for people with differing needs and abilities. Schools should be designed to respond to the needs of children of different ages and developmental stages, foster a sense of belonging and seek to reflect the cultural diversity of the student body and community. Schools should be designed to enable sharing of facilities with the community and to cater for activities outside of school hours. 4 Healthy and safe Good school design should support wellbeing by creating healthy internal and external environments. The design should ensure safety and security within the school boundaries, while maintaining a welcoming address and accessible environment. In designing schools, consideration should be given to connections, transport networks and safe routes for travel to and from school. 5 Functional and comfortable Schools should have comfortable and engaging spaces that are accessible for a wide range of formal and informal educational and community activities. In designing schools, consideration should be given to the amenity of adjacent development, access to sunlight, natural ventilation, proximity to vegetation and landscape, outlook and visual and acoustic privacy. Schools should include appropriate indoor and outdoor learning and play spaces, access to services and adequate storage. 6 Flexible and adaptable In designing schools, consideration should be given to future needs and take a long-term approach that is informed by site-wide strategic and spatial planning. Good design for schools should deliver high environmental performance and ease of adaptation, and maximise multi-use facilities. Schools should be adaptable to evolving teaching methods, future growth and changes in climate, and should minimise the environmental impact of the school across its life cycle. 7
Visual appeal
School buildings and their landscape settings should be aesthetically pleasing by achieving good proportions and a balanced composition of built and natural elements. Schools should be designed to respond to and have a positive impact on streetscape amenity and the quality and character of the neighbourhood. The identity and street presence of schools should respond to the existing or desired future character of their locations. The design of schools should reflect the school’s civic role and community significance.
Visually appealing School buildings and their landscape settings should be aesthetically pleasing by achieving good proportions and a balanced composition of built and natural elements. Schools should be designed to respond to and have a positive impact on streetscape amenity and the quality and character of the neighbourhood. The identity and street presence of schools should respond to the existing or desired future character of their locations. The design of schools should reflect the school’s civic role and community significance.
— Not present in the earlier version —
— Removed in the later version —
— Not present in the earlier version —
State Environmental Planning Policy (Transport and Infrastructure) 2021 (732) . LW 2.12.2021. Date of commencement, 1.3.2022, sec 2. This Policy has been amended by this Policy, Sch 12, sec 7 and as follows— 2022 (132) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Miscellaneous) 2022 . LW 1.4.2022. Date of commencement, on publication on LW, sec 2. (248) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Moorebank Freight Intermodal Precinct) 2022 . LW 27.5.2022. Date of commencement, on publication on LW, sec 2. (274) State Environmental Planning Policy Amendment (Temporary Emergency Facilities) 2022 . LW 3.6.2022. Date of commencement, on publication on LW, sec 2. (373) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Three Ports) 2022 . LW 8.7.2022. Date of commencement, on publication on LW, sec 2. (441) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Miscellaneous) (No 2) 2022 . LW 5.8.2022. Date of commencement, on publication on LW, sec 2. (451) State Environmental Planning Policy Amendment (Housing Supply) 2022 . LW 12.8.2022. Date of commencement, on publication on LW, sec 2. (461) State Environmental Planning Policy (Biodiversity and Conservation) Amendment (Strategic Conservation Planning) 2022 . LW 17.8.2022. Date of commencement, on publication on LW, sec 2(1). (517) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Intertrade Industrial Park) 2022 . LW 26.8.2022. Date of commencement, on publication on LW, sec 2. (528) State Environmental Planning Policy (Exempt and Complying Development Codes) Amendment (Change of Use) 2022 . LW 1.9.2022. Date of commencement, on publication on LW, sec 2. (629) State Environmental Planning Policy Amendment (Water Catchments) 2022 . LW 21.10.2022. Date of commencement, 21.11.2022, sec 2. (664) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Bee Keeping and Grazing) 2022 . LW 4.11.2022. Date of commencement, 9.11.2022, sec 2. (727) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Land Use Zones) 2022 . LW 30.11.2022. Date of commencement, on the commencement of Standard Instrument (Local Environmental Plans) Amendment (Land Use Zones) Order 2022 (ie 30.11.2022), sec 2. (742) State Environmental Planning Policy Amendment (Miscellaneous) (No 2) 2022 . LW 2.12.2022. Date of commencement, on publication on LW, sec 2. (768) State Environmental Planning Policy Amendment (Exempt and Complying Development) 2022 . LW 9.12.2022. Date of commencement, on publication on LW, sec 2. (825) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Thermal Energy from Waste) 2022 . LW 16.12.2022. Date of commencement, on publication on LW, sec 2. (826) State Environmental Planning Policy Amendment (Blackwattle Bay Precinct) 2022 . LW 16.12.2022. Date of commencement, 8.9.23, sec 2. Amended by Sydney Local Environmental Plan Amendment (Precincts) 2023 (275) . LW 8.6.2023. Date of commencement, 8.6.23, cl 2. 2023 (36) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Water Supply Systems) 2023 . LW 3.2.2023. Date of commencement, on publication on LW, sec 2. (80) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Electric Vehicles) 2023 . LW 24.2.2023. Date of commencement, on publication on LW, sec 2. (83) State Environmental Planning Policy Amendment (National Construction Code) 2023 . LW 24.2.2023. Date of commencement, 1.5.2023, sec 2. (458) State Environmental Planning Policy Amendment (Agritourism) 2023 . LW 18.8.2023. Date of commencement, on publication on LW, sec 2. (523) State Environmental Planning Policy Amendment (Estimated Development Cost) 2023 . LW 15.9.2023. Date of commencement, 4.3.2024, sec 2. (524) State Environmental Planning Policy Amendment (Exceptions to Development Standards) 2023 . LW 15.9.2023. Date of commencement, 1.11.2023, sec 2. No 35 Statute Law (Miscellaneous Provisions) Act (No 2) 2023 . Assented to 30.10.2023. Date of commencement of Sch 4, assent, sec 2(c). (609) State Environmental Planning Policy Amendment (Flood Planning) 2023 . LW 10.11.2023. Date of commencement, on publication on LW, sec 2. 2024 (29) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Port Kembla) 2024 . LW 9.2.2024. Date of commencement, on publication on LW, sec 2. (115) State Environmental Planning Policy (Transport and Infrastructure) Amendment 2024 . LW 5.4.2024. Date of commencement, on publication on LW, sec 2. (452) Inner West Local Environmental Plan Amendment (Electric Vehicle Charging Units) 2024 . LW 30.8.2024. Date of commencement, on publication on LW, cl 2. (505) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Cemeteries) 2024 . LW 27.9.2024. Date of commencement, on publication on LW, sec 2. No 67 Ports and Maritime Administration Amendment Act 2024 . Assented to 30.9.2024. Date of commencement of Sch 5, assent, sec 2(b). (585) State Environmental Planning Policy (Transport and Infrastructure) Amendment (No 2) 2024 . LW 22.11.2024. Date of commencement, on publication on LW, sec 2. (594) State Environmental Planning Policy Amendment (Exemptions) 2024 . LW 27.11.2024. Date of commencement, on publication on LW, sec 2(b). (609) State Environmental Planning Policy (Exempt and Complying Development Codes) Amendment (Miscellaneous) 2024 . LW 29.11.2024. Date of commencement, on publication on LW, sec 2. (654) State Environmental Planning Policy (Transport and Infrastructure) Amendment (No 3) 2024 . LW 13.12.2024. Date of commencement, on publication on LW, sec 2. 2025 (291) State Environmental Planning Policy (Housing) Amendment (Diverse Housing) 2025 . LW 20.6.2025. Date of commencement, on publication on LW, sec 2. (352) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Government Schools) 2025 . LW 11.7.2025. Date of commencement, on publication on LW, sec 2.
State Environmental Planning Policy (Transport and Infrastructure) 2021 (732) . LW 2.12.2021. Date of commencement, 1.3.2022, sec 2. This Policy has been amended by this Policy, Sch 12, sec 7 and as follows— 2022 (132) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Miscellaneous) 2022 . LW 1.4.2022. Date of commencement, on publication on LW, sec 2. (248) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Moorebank Freight Intermodal Precinct) 2022 . LW 27.5.2022. Date of commencement, on publication on LW, sec 2. (274) State Environmental Planning Policy Amendment (Temporary Emergency Facilities) 2022 . LW 3.6.2022. Date of commencement, on publication on LW, sec 2. (373) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Three Ports) 2022 . LW 8.7.2022. Date of commencement, on publication on LW, sec 2. (441) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Miscellaneous) (No 2) 2022 . LW 5.8.2022. Date of commencement, on publication on LW, sec 2. (451) State Environmental Planning Policy Amendment (Housing Supply) 2022 . LW 12.8.2022. Date of commencement, on publication on LW, sec 2. (461) State Environmental Planning Policy (Biodiversity and Conservation) Amendment (Strategic Conservation Planning) 2022 . LW 17.8.2022. Date of commencement, on publication on LW, sec 2(1). (517) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Intertrade Industrial Park) 2022 . LW 26.8.2022. Date of commencement, on publication on LW, sec 2. (528) State Environmental Planning Policy (Exempt and Complying Development Codes) Amendment (Change of Use) 2022 . LW 1.9.2022. Date of commencement, on publication on LW, sec 2. (629) State Environmental Planning Policy Amendment (Water Catchments) 2022 . LW 21.10.2022. Date of commencement, 21.11.2022, sec 2. (664) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Bee Keeping and Grazing) 2022 . LW 4.11.2022. Date of commencement, 9.11.2022, sec 2. (727) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Land Use Zones) 2022 . LW 30.11.2022. Date of commencement, on the commencement of Standard Instrument (Local Environmental Plans) Amendment (Land Use Zones) Order 2022 (ie 30.11.2022), sec 2. (742) State Environmental Planning Policy Amendment (Miscellaneous) (No 2) 2022 . LW 2.12.2022. Date of commencement, on publication on LW, sec 2. (768) State Environmental Planning Policy Amendment (Exempt and Complying Development) 2022 . LW 9.12.2022. Date of commencement, on publication on LW, sec 2. (825) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Thermal Energy from Waste) 2022 . LW 16.12.2022. Date of commencement, on publication on LW, sec 2. (826) State Environmental Planning Policy Amendment (Blackwattle Bay Precinct) 2022 . LW 16.12.2022. Date of commencement, 8.9.23, sec 2. Amended by Sydney Local Environmental Plan Amendment (Precincts) 2023 (275) . LW 8.6.2023. Date of commencement, 8.6.23, cl 2. 2023 (36) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Water Supply Systems) 2023 . LW 3.2.2023. Date of commencement, on publication on LW, sec 2. (80) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Electric Vehicles) 2023 . LW 24.2.2023. Date of commencement, on publication on LW, sec 2. (83) State Environmental Planning Policy Amendment (National Construction Code) 2023 . LW 24.2.2023. Date of commencement, 1.5.2023, sec 2. (458) State Environmental Planning Policy Amendment (Agritourism) 2023 . LW 18.8.2023. Date of commencement, on publication on LW, sec 2. (523) State Environmental Planning Policy Amendment (Estimated Development Cost) 2023 . LW 15.9.2023. Date of commencement, 4.3.2024, sec 2. (524) State Environmental Planning Policy Amendment (Exceptions to Development Standards) 2023 . LW 15.9.2023. Date of commencement, 1.11.2023, sec 2. No 35 Statute Law (Miscellaneous Provisions) Act (No 2) 2023 . Assented to 30.10.2023. Date of commencement of Sch 4, assent, sec 2(c). (609) State Environmental Planning Policy Amendment (Flood Planning) 2023 . LW 10.11.2023. Date of commencement, on publication on LW, sec 2. 2024 (29) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Port Kembla) 2024 . LW 9.2.2024. Date of commencement, on publication on LW, sec 2. (115) State Environmental Planning Policy (Transport and Infrastructure) Amendment 2024 . LW 5.4.2024. Date of commencement, on publication on LW, sec 2. (452) Inner West Local Environmental Plan Amendment (Electric Vehicle Charging Units) 2024 . LW 30.8.2024. Date of commencement, on publication on LW, cl 2. (505) State Environmental Planning Policy (Transport and Infrastructure) Amendment (Cemeteries) 2024 . LW 27.9.2024. Date of commencement, on publication on LW, sec 2. No 67 Ports and Maritime Administration Amendment Act 2024 . Assented to 30.9.2024. Date of commencement of Sch 5, assent, sec 2(b). (585) State Environmental Planning Policy (Transport and Infrastructure) Amendment (No 2) 2024 . LW 22.11.2024. Date of commencement, on publication on LW, sec 2. (594) State Environmental Planning Policy Amendment (Exemptions) 2024 . LW 27.11.2024. Date of commencement, on publication on LW, sec 2(b). (609) State Environmental Planning Policy (Exempt and Complying Development Codes) Amendment (Miscellaneous) 2024 . LW 29.11.2024. Date of commencement, on publication on LW, sec 2. (654) State Environmental Planning Policy (Transport and Infrastructure) Amendment (No 3) 2024 . LW 13.12.2024. Date of commencement, on publication on LW, sec 2. 2025 (291) State Environmental Planning Policy (Housing) Amendment (Diverse Housing) 2025 . LW 20.6.2025. Date of commencement, on publication on LW, sec 2.
— Removed in the later version —
— Not present in the earlier version —
Sec 1.3 Am 2024 (585), Sch 1[1]; 2025 (291), Sch 3[1]. Sec 2.3 Am 2023 (523), Sch 2.8[1]; 2023 (609), Sch 2.22[1]; 2024 (654), Sch 1[1]. Sec 2.4 Am 2022 (517), Sch 1[1]. Sec 2.7 Am 2024 (654), Sch 1[2]–[7]. Sec 2.9A Ins 2023 (83), Sch 2.6[1]. Sec 2.12 Am 2023 (609), Sch 2.22[2]. Sec 2.13 Am 2023 (609), Sch 2.22[2]. Sec 2.14 Am 2024 (654), Sch 1[8]. Sec 2.15 Am 2022 (517), Sch 1[2]; 2022 (629), Sch 3.19[1]–[3]; 2022 (742), Sch 1[1]; 2023 (523), Sch 2.8[2]. Sec 2.16 Am 2023 (83), Sch 2.6[2]. Part 2.2, Div 2, note Am 2022 (517), Sch 1[1]. Sec 2.18 Am 2022 (517), Sch 1[1]–[3]. Sec 2.19 Am 2022 (517), Sch 1[1]. Sec 2.20 Am 2024 (609), Sch 2[1]. Sec 2.21 Am 2022 (742), Sch 1[2] [3]. Sec 2.22 Am 2024 (609), Sch 2[1]. Sec 2.23 Am 2022 (517), Sch 1[4]. Sec 2.24 Am 2022 (727), Sch 1[1]–[3]. Sec 2.26 Am 2022 (727), Sch 1[4]. Part 2.3, Div 3, heading Am 2022 (768), Sch 3[1]. Sec 2.31 Am 2022 (727), Sch 1[5] [6]; 2022 (768), Sch 3[2]. Sec 2.35 Am 2022 (132), Sch 1[1]–[3]; 2022 (727), Sch 1[7]. Sec 2.36 Am 2022 (727), Sch 1[8]; 2022 (825), Sch 1[1]. Sec 2.38 Am 2022 (825), Sch 1[1]. Sec 2.39 Am 2022 (727), Sch 1[8]. Sec 2.40 Am 2022 (825), Sch 1[2]. Sec 2.41 Am 2022 (132), Sch 1[4]–[6]; 2022 (727), Sch 1[8]. Sec 2.44 Am 2024 (654), Sch 1[6] [9]. Sec 2.44A Ins 2024 (654), Sch 1[10]. Sec 2.48 Am 2022 (742), Sch 1[4]. Sec 2.49 Am 2022 (727), Sch 1[9] [10]. Sec 2.52 Am 2024 (585), Sch 1[2] [3]; 2024 (654), Sch 1[11]. Sec 2.54 Am 2024 (654), Sch 1[12]. Part 2.3, Div 9 Subst 2022 (664), sec 4. Sec 2.58A Ins 2022 (664), sec 4. Sec 2.58B Ins 2022 (664), sec 4. Sec 2.59 Am 2022 (727), Sch 1[11] [12]; 2024 (585), Sch 1[4] [5]. Sec 2.60 Am 2022 (517), Sch 1[1] [5]. Sec 2.61 Am 2022 (517), Sch 1[6]; 2022 (727), Sch 1[13]; 2024 (585), Sch 1[6]–[8]. Sec 2.61A Ins 2024 (585), Sch 1[9]. Sec 2.62 Am 2024 (585), Sch 1[10]. Sec 2.62A Ins 2024 (585), Sch 1[11]. Sec 2.63 Am 2022 (742), Sch 1[5]; 2025 (291), Sch 3[2]. Sec 2.63A Ins 2022 (132), Sch 1[7]. Rep 2024 (585), Sch 1[12]. Sec 2.69 Am 2022 (826), Sch 1.3[1] [2]. Sec 2.70 Am 2022 (528), sec 4(1). Sec 2.70A Ins 2022 (826), Sch 1.3[3]. Sec 2.73 Am 2022 (742), Sch 1[6]. Sec 2.74 Am 2022 (528), sec 4(2); 2022 (742), Sch 1[7] [8]. Sec 2.75 Am 2022 (517), Sch 1[2]. Sec 2.78 Am 2022 (727), Sch 1[14]–[16]; 2024 (654), Sch 1[13] [14]. Sec 2.80 Am 2024 (654), Sch 1[9] [15]. Sec 2.80A Ins 2024 (654), Sch 1[16]. Sec 2.81 Am 2024 (654), Sch 1[17]. Sec 2.82 Am 2022 (517), Sch 1[7]. Sec 2.85 Am 2022 (727), Sch 1[17] [18]. Sec 2.91 Am 2022 (441), Sch 1[1]; 2022 (727), Sch 1[19]; 2024 (654), Sch 1[18] [19]. Sec 2.92 Am 2024 (654), Sch 1[20]. Sec 2.93A Ins 2024 (654), Sch 1[21]. Sec 2.94 Am 2022 (742), Sch 1[9]; 2024 (654), Sch 1[22]. Sec 2.95 Am 2022 (441), Sch 1[2]–[4]. Sec 2.96 Subst 2022 (441), Sch 1[5]. Sec 2.96A Ins 2022 (441), Sch 1[5]. Sec 2.98 Am 2022 (517), Sch 1[1]. Sec 2.99 Am 2022 (517), Sch 1[1]. Sec 2.100 Am 2022 (517), Sch 1[1]. Sec 2.101 Am 2023 (523), Sch 2.8[2]. Sec 2.104 Am 2022 (727), Sch 1[20]. Sec 2.107 Am 2022 (517), Sch 1[2]. Sec 2.108 Am 2022 (727), Sch 1[21] [22]; 2024 (654), Sch 1[23] [24]. Sec 2.109 Am 2022 (742), Sch 1[10]; 2024 (654), Sch 1[25]. Sec 2.110A Ins 2024 (654), Sch 1[26]. Sec 2.111 Am 2024 (654), Sch 1[27]. Sec 2.112 Am 2024 (654), Sch 1[28]. Sec 2.118 Am 2023 (523), Sch 2.8[2]. Sec 2.120 Am 2022 (451), Sch 3; 2022 (517), Sch 1[1]. Sec 2.121 Am 2022 (517), Sch 1[1]. Sec 2.122A Ins 2024 (594), Sch 4. Part 2.3, Div 17. Subdiv 3 Subst 2023 (80), Sch 1. Sec 2.123 Subst 2023 (80), Sch 1. Am 2024 (654), Sch 1[29]. Sec 2.124 Subst 2023 (80), Sch 1. Am 2024 (654), Sch 1[30]–[34]. Sec 2.124A Ins 2023 (80), Sch 1. Am 2023 (458), Sch 3.6[1]–[3]; 2024 (654), Sch 1[35]. Sec 2.124B Ins 2023 (80), Sch 1. Sec 2.124C Ins 2023 (80), Sch 1. Sec 2.124D Ins 2023 (80), Sch 1. Am 2024 (115), Sch 1[1] [2]; 2024 (654), Sch 1[34] [36]. Sec 2.124E Ins 2023 (80), Sch 1. Am 2024 (452), Sch 1; 2024 (654), Sch 1[34] [37]. Sec 2.124F Ins 2023 (80), Sch 1. Am 2024 (654), Sch 1[34] [38] [39]. Sec 2.125 Am 2022 (727), Sch 1[23]. Sec 2.126 Am 2024 (115), Sch 1[3] [4]. Sec 2.126A Ins 2024 (654), Sch 1[40]. Sec 2.131 Am 2022 (517), Sch 1[3] [8]. Sec 2.136 Am 2024 (654), Sch 1[41] [42]. Sec 2.137 Subst 2024 (654), Sch 1[43]. Sec 2.137A Ins 2024 (654), Sch 1[43]. Sec 2.140 Am 2022 (132), Sch 1[8]–[10]. Sec 2.141 Am 2022 (132), Sch 1[11]; 2022 (441), Sch 1[6] [7]; 2022 (517), Sch 1[1]. Sec 2.143 Am 2022 (517), Sch 1[1]. Sec 2.145 Am 2022 (132), Sch 1[12]. Sec 2.152 Am 2022 (727), Sch 1[24]. Sec 2.153 Am 2022 (727), Sch 1[25] [26]; 2022 (825), Sch 1[3]. Sec 2.158 Am 2022 (727), Sch 1[27]; 2023 (36), sec 4. Sec 2.159 Am 2023 (458), Sch 3.6[4] [5]; 2024 (654), Sch 1[9]. Sec 2.159A Ins 2024 (654), Sch 1[44]. Sec 2.161 Am 2024 (654), Sch 1[45]. Sec 2.165 Am 2022 (742), Sch 1[11]. Sec 2.165A Ins 2022 (742), Sch 1[12]. Part 2.3, Div 25A Rep 2022 (629), Sch 3.19[4]. Sec 2.166 Rep 2022 (629), Sch 3.19[4]. Sec 2.167 Rep 2022 (629), Sch 3.19[4]. Sec 2.169 Ins 2022 (132), Sch 1[13]. Rep 2022 (461), Sch 2.1[1]. Part 2.3, Div 27 Ins 2022 (274), Sch 1. Sec 2.170 Ins 2022 (274), Sch 1. Part 2.3, Div 28 Ins 2022 (825), Sch 1[4]. Sec 2.171 Ins 2022 (825), Sch 1[4]. Part 2.3, Div 29 Ins 2024 (505), Sch 1[1]. Part 2.3, Div 29, Subdiv 1 Ins 2024 (505), Sch 1[1]. Sec 2.172 Ins 2024 (505), Sch 1[1]. Sec 2.173 Ins 2024 (505), Sch 1[1]. Part 2.3, Div 29, Subdiv 2 Ins 2024 (505), Sch 1[1]. Sec 2.174 Ins 2024 (505), Sch 1[1]. Sec 2.175 Ins 2024 (505), Sch 1[1]. Part 2.3, Div 29, Subdiv 3 Ins 2024 (505), Sch 1[1]. Sec 2.176 Ins 2024 (505), Sch 1[1]. Sec 2.177 Ins 2024 (505), Sch 1[1]. Sec 2.178 Ins 2024 (505), Sch 1[1]. Sec 2.179 Ins 2024 (505), Sch 1[1]. Sec 3.3 Am 2022 (742), Sch 1[13]; 2023 (83), Sch 2.6[2]; 2023 (609), Sch 2.22[3]; 2024 (585), Sch 1[13]. Sec 3.6 Am 2022 (461), Sch 2.1[2]. Sec 3.10 Am 2023 (609), Sch 2.22[4]. Sec 3.15 Am 2022 (517), Sch 1[2] [3]. Sec 3.16 Am 2024 (609), Sch 2[2]. Sec 3.17 Am 2022 (742), Sch 1[14]; 2025 (291), Sch 3[3]. Sec 3.18 Am 2022 (629), Sch 3.19[5]; 2023 (523), Sch 2.8[3]–[7]. Sec 3.19 Am 2024 (585), Sch 1[14]. Sec 3.21 Am 2022 (517), Sch 1[4]; 2023 No 35, Sch 4.40. Sec 3.24 Am 2022 (727), Sch 1[28]–[30]. Sec 3.34 Am 2022 (517), Sch 1[6]; 2022 (727), Sch 1[31] [32]; 2022 (742), Sch 1[15]; 2024 (115), Sch 1[5]; 2024 (585), Sch 1[15] [16]; 2025 (352), Sch 1[1] [2]. Sec 3.36 Am 2022 (742), Sch 1[16]; 2023 (523), Sch 2.8[8] [9]. Sec 3.37 Am 2022 (742), Sch 1[16]; 2024 (585), Sch 1[17]–[26]; 2025 (352), Sch 1[3] [4]. Sec 3.37A Ins 2024 (585), Sch 1[28]. Am 2025 (352), Sch 1[5]. Sec 3.38A Ins 2024 (585), Sch 1[28]. Sec 3.38 Am 2024 (585), Sch 1[27]. Sec 3.39 Am 2022 (742), Sch 1[16] [17]; 2024 (115), Sch 1[6]; 2024 (585), Sch 1[29]–[33]; 2025 (291), Sch 3[4]. Sec 3.40 Am 2022 (742), Sch 1[16] [17]; 2024 (115), Sch 1[7]–[9]; 2024 (585), Sch 1[34]–[37]. Sec 3.41 Am 2022 (742), Sch 1[16]. Sec 3.44 Am 2022 (517), Sch 1[6]; 2022 (727), Sch 1[33] [34]. Sec 3.46 Am 2024 (654), Sch 1[46]. Sec 3.47 Am 2024 (654), Sch 1[47] [48]. Sec 3.49 Am 2025 (291), Sch 3[5]. Sec 3.51 Am 2022 (517), Sch 1[6]; 2022 (727), Sch 1[35] [36]. Sec 3.56 Am 2025 (291), Sch 3[6]. Sec 4.2 Am 2023 (523), Sch 2.8[10]. Sec 4.5 Am 2024 (585), Sch 1[38]. Sec 4.7 Am 2023 (523), Sch 2.8[11]. Chapter 5, heading Am 2022 (373), Sch 1[1]. Sec 5.2 Am 2022 (373), Sch 1[2]–[4]; 2022 (517), Sch 1[9] [10]; 2023 (523), Sch 2.8[12]; 2024 No 67, Sch 5.6[1]. Sec 5.3 Subst 2022 (373), Sch 1[5]. Am 2022 (517), Sch 1[11]. Sec 5.4 Am 2022 (517), Sch 1[12]–[15]. Sec 5.5 Am 2022 (373), Sch 1[6]. Sec 5.6 Subst 2022 (373), Sch 1[7]. Am 2022 (517), Sch 1[16]. Sec 5.9 Am 2022 (517), Sch 1[17]; 2023 (524), Sch 1.4[1] [2]. Sec 5.10 Am 2022 (373), Sch 1[8]. Sec 5.14 Am 2022 (373), Sch 1[9]; 2024 No 67, Sch 5.6[2]. Sec 5.16 Am 2022 (517), Sch 1[18]; 2023 (523), Sch 2.8[13]. Sec 5.17 Subst 2022 (373), Sch 1[10]. Sec 5.19A Ins 2022 (373), Sch 1[11]. Sec 5.19B Ins 2022 (373), Sch 1[11]. Sec 5.20 Am 2022 (373), Sch 1[12]–[16]. Sec 5.21 Am 2024 (29), Sch 1[1] [2]. Sec 5.22 Am 2023 (524), Sch 1.4[3]. Sec 5.23A Ins 2022 (629), Sch 3.19[6]. Land Use Table Am 2022 (373), Sch 1[17]–[20]. Sec 5.24 Am 2022 (373), Sch 1[21]–[24]. Sec 5.25 Am 2022 (373), Sch 1[23] [25]–[27]. Sec 5.26 Am 2022 (373), Sch 1[6]. Sec 5.27 Am 2023 (523), Sch 2.8[13]. Sec 5.28 Am 2023 (523), Sch 2.8[13]. Sec 5.29 Am 2022 (373), Sch 1[6] [28]–[33]. Sec 5.30 Am 2022 (373), Sch 1[6] [32] [34]. Sec 5.31 Am 2022 (373), Sch 1[35] [36]; 2022 (517), Sch 1[19] [20]. Chapter 6 Ins 2022 (248), Sch 1[1]. Part 6.1 Ins 2022 (248), Sch 1[1]. Sec 6.1 Ins 2022 (248), Sch 1[1]. Sec 6.2 Ins 2022 (248), Sch 1[1]. Sec 6.3 Ins 2022 (248), Sch 1[1]. Sec 6.4 Ins 2022 (248), Sch 1[1]. Part 6.2 Ins 2022 (248), Sch 1[1]. Sec 6.5 Ins 2022 (248), Sch 1[1]. Sec 6.6 Ins 2022 (248), Sch 1[1]. Sec 6.7 Ins 2022 (248), Sch 1[1]. Am 2022 (742), Sch 1[18]–[25]. Part 6.3 Ins 2022 (248), Sch 1[1]. Sec 6.8 Ins 2022 (248), Sch 1[1]. Sec 6.9 Ins 2022 (248), Sch 1[1]. Part 6.4 Ins 2022 (248), Sch 1[1]. Sec 6.10 Ins 2022 (248), Sch 1[1]. Sec 6.11 Ins 2022 (248), Sch 1[1]. Am 2024 (654), Sch 1[49]. Sch 1, heading Am 2022 (248), Sch 1[2]. Sch 1 Am 2022 (517), Sch 1[1] [7]; 2022 (742), Sch 1[26]–[28]. Sch 2, heading Am 2022 (248), Sch 1[3]. Sch 3, heading Am 2022 (248), Sch 1[4]. Sch 4, heading Am 2022 (248), Sch 1[5]. Sch 4 Am 2022 (132), Sch 1[14]–[23]; 2022 (517), Sch 1[21]; 2022 (727), Sch 1[37]. Sch 4A Ins 2024 (505), Sch 1[2]. Sch 5, heading Am 2022 (248), Sch 1[6]. Sch 5 Am 2022 (517), Sch 1[7]; 2022 (742), Sch 1[29] [30]; 2024 (585), Sch 1[39]–[42]; 2024 (654), Sch 1[50]. Sch 6, heading Subst 2022 (248), Sch 1[7]. Sch 6 Am 2022 (517), Sch 1[22]; 2023 (609), Sch 2.22[5]–[7]; 2024 (115), Sch 1[10]. Sch 7, heading Subst 2022 (248), Sch 1[8]. Sch 7 Am 2022 (517), Sch 1[23]; 2023 (609), Sch 2.22[8]–[10]. Sch 8, heading Subst 2022 (248), Sch 1[9]; 2024 (585), Sch 1[43]. Sch 8 Subst 2024 (585), Sch 1[43]. Am 2025 (352), Sch 1[6]. Sch 9, heading Am 2022 (248), Sch 1[10]. Sch 9 Am 2023 (83), Sch 2.6[3]; 2023 (609), Sch 2.22[11]. Sch 10, heading Am 2022 (248), Sch 1[11]. Sch 10 Am 2022 (373), Sch 1[37]–[51]; 2022 (517), Sch 1[7]; 2024 (609), Sch 2[3]. Sch 11, heading Am 2022 (248), Sch 1[11]. Sch 11 Am 2022 (373), Sch 1[4] [45] [49] [52]–[66]; 2023 (523), Sch 2.8[14]. Sch 12 Ins 2022 (373), Sch 1[67]. Sch 12 Rep 2021 (732), Sch 12. Ins 2022 (248), Sch 1[12]. Am 2024 (609), Sch 2[4]. Sch 13 Ins 2022 (248), Sch 1[12]. Am 2024 (654), Sch 1[51].
Sec 1.3 Am 2024 (585), Sch 1[1]; 2025 (291), Sch 3[1]. Sec 2.3 Am 2023 (523), Sch 2.8[1]; 2023 (609), Sch 2.22[1]; 2024 (654), Sch 1[1]. Sec 2.4 Am 2022 (517), Sch 1[1]. Sec 2.7 Am 2024 (654), Sch 1[2]–[7]. Sec 2.9A Ins 2023 (83), Sch 2.6[1]. Sec 2.12 Am 2023 (609), Sch 2.22[2]. Sec 2.13 Am 2023 (609), Sch 2.22[2]. Sec 2.14 Am 2024 (654), Sch 1[8]. Sec 2.15 Am 2022 (517), Sch 1[2]; 2022 (629), Sch 3.19[1]–[3]; 2022 (742), Sch 1[1]; 2023 (523), Sch 2.8[2]. Sec 2.16 Am 2023 (83), Sch 2.6[2]. Part 2.2, Div 2, note Am 2022 (517), Sch 1[1]. Sec 2.18 Am 2022 (517), Sch 1[1]–[3]. Sec 2.19 Am 2022 (517), Sch 1[1]. Sec 2.20 Am 2024 (609), Sch 2[1]. Sec 2.21 Am 2022 (742), Sch 1[2] [3]. Sec 2.22 Am 2024 (609), Sch 2[1]. Sec 2.23 Am 2022 (517), Sch 1[4]. Sec 2.24 Am 2022 (727), Sch 1[1]–[3]. Sec 2.26 Am 2022 (727), Sch 1[4]. Part 2.3, Div 3, heading Am 2022 (768), Sch 3[1]. Sec 2.31 Am 2022 (727), Sch 1[5] [6]; 2022 (768), Sch 3[2]. Sec 2.35 Am 2022 (132), Sch 1[1]–[3]; 2022 (727), Sch 1[7]. Sec 2.36 Am 2022 (727), Sch 1[8]; 2022 (825), Sch 1[1]. Sec 2.38 Am 2022 (825), Sch 1[1]. Sec 2.39 Am 2022 (727), Sch 1[8]. Sec 2.40 Am 2022 (825), Sch 1[2]. Sec 2.41 Am 2022 (132), Sch 1[4]–[6]; 2022 (727), Sch 1[8]. Sec 2.44 Am 2024 (654), Sch 1[6] [9]. Sec 2.44A Ins 2024 (654), Sch 1[10]. Sec 2.48 Am 2022 (742), Sch 1[4]. Sec 2.49 Am 2022 (727), Sch 1[9] [10]. Sec 2.52 Am 2024 (585), Sch 1[2] [3]; 2024 (654), Sch 1[11]. Sec 2.54 Am 2024 (654), Sch 1[12]. Part 2.3, Div 9 Subst 2022 (664), sec 4. Sec 2.58A Ins 2022 (664), sec 4. Sec 2.58B Ins 2022 (664), sec 4. Sec 2.59 Am 2022 (727), Sch 1[11] [12]; 2024 (585), Sch 1[4] [5]. Sec 2.60 Am 2022 (517), Sch 1[1] [5]. Sec 2.61 Am 2022 (517), Sch 1[6]; 2022 (727), Sch 1[13]; 2024 (585), Sch 1[6]–[8]. Sec 2.61A Ins 2024 (585), Sch 1[9]. Sec 2.62 Am 2024 (585), Sch 1[10]. Sec 2.62A Ins 2024 (585), Sch 1[11]. Sec 2.63 Am 2022 (742), Sch 1[5]; 2025 (291), Sch 3[2]. Sec 2.63A Ins 2022 (132), Sch 1[7]. Rep 2024 (585), Sch 1[12]. Sec 2.69 Am 2022 (826), Sch 1.3[1] [2]. Sec 2.70 Am 2022 (528), sec 4(1). Sec 2.70A Ins 2022 (826), Sch 1.3[3]. Sec 2.73 Am 2022 (742), Sch 1[6]. Sec 2.74 Am 2022 (528), sec 4(2); 2022 (742), Sch 1[7] [8]. Sec 2.75 Am 2022 (517), Sch 1[2]. Sec 2.78 Am 2022 (727), Sch 1[14]–[16]; 2024 (654), Sch 1[13] [14]. Sec 2.80 Am 2024 (654), Sch 1[9] [15]. Sec 2.80A Ins 2024 (654), Sch 1[16]. Sec 2.81 Am 2024 (654), Sch 1[17]. Sec 2.82 Am 2022 (517), Sch 1[7]. Sec 2.85 Am 2022 (727), Sch 1[17] [18]. Sec 2.91 Am 2022 (441), Sch 1[1]; 2022 (727), Sch 1[19]; 2024 (654), Sch 1[18] [19]. Sec 2.92 Am 2024 (654), Sch 1[20]. Sec 2.93A Ins 2024 (654), Sch 1[21]. Sec 2.94 Am 2022 (742), Sch 1[9]; 2024 (654), Sch 1[22]. Sec 2.95 Am 2022 (441), Sch 1[2]–[4]. Sec 2.96 Subst 2022 (441), Sch 1[5]. Sec 2.96A Ins 2022 (441), Sch 1[5]. Sec 2.98 Am 2022 (517), Sch 1[1]. Sec 2.99 Am 2022 (517), Sch 1[1]. Sec 2.100 Am 2022 (517), Sch 1[1]. Sec 2.101 Am 2023 (523), Sch 2.8[2]. Sec 2.104 Am 2022 (727), Sch 1[20]. Sec 2.107 Am 2022 (517), Sch 1[2]. Sec 2.108 Am 2022 (727), Sch 1[21] [22]; 2024 (654), Sch 1[23] [24]. Sec 2.109 Am 2022 (742), Sch 1[10]; 2024 (654), Sch 1[25]. Sec 2.110A Ins 2024 (654), Sch 1[26]. Sec 2.111 Am 2024 (654), Sch 1[27]. Sec 2.112 Am 2024 (654), Sch 1[28]. Sec 2.118 Am 2023 (523), Sch 2.8[2]. Sec 2.120 Am 2022 (451), Sch 3; 2022 (517), Sch 1[1]. Sec 2.121 Am 2022 (517), Sch 1[1]. Sec 2.122A Ins 2024 (594), Sch 4. Part 2.3, Div 17. Subdiv 3 Subst 2023 (80), Sch 1. Sec 2.123 Subst 2023 (80), Sch 1. Am 2024 (654), Sch 1[29]. Sec 2.124 Subst 2023 (80), Sch 1. Am 2024 (654), Sch 1[30]–[34]. Sec 2.124A Ins 2023 (80), Sch 1. Am 2023 (458), Sch 3.6[1]–[3]; 2024 (654), Sch 1[35]. Sec 2.124B Ins 2023 (80), Sch 1. Sec 2.124C Ins 2023 (80), Sch 1. Sec 2.124D Ins 2023 (80), Sch 1. Am 2024 (115), Sch 1[1] [2]; 2024 (654), Sch 1[34] [36]. Sec 2.124E Ins 2023 (80), Sch 1. Am 2024 (452), Sch 1; 2024 (654), Sch 1[34] [37]. Sec 2.124F Ins 2023 (80), Sch 1. Am 2024 (654), Sch 1[34] [38] [39]. Sec 2.125 Am 2022 (727), Sch 1[23]. Sec 2.126 Am 2024 (115), Sch 1[3] [4]. Sec 2.126A Ins 2024 (654), Sch 1[40]. Sec 2.131 Am 2022 (517), Sch 1[3] [8]. Sec 2.136 Am 2024 (654), Sch 1[41] [42]. Sec 2.137 Subst 2024 (654), Sch 1[43]. Sec 2.137A Ins 2024 (654), Sch 1[43]. Sec 2.140 Am 2022 (132), Sch 1[8]–[10]. Sec 2.141 Am 2022 (132), Sch 1[11]; 2022 (441), Sch 1[6] [7]; 2022 (517), Sch 1[1]. Sec 2.143 Am 2022 (517), Sch 1[1]. Sec 2.145 Am 2022 (132), Sch 1[12]. Sec 2.152 Am 2022 (727), Sch 1[24]. Sec 2.153 Am 2022 (727), Sch 1[25] [26]; 2022 (825), Sch 1[3]. Sec 2.158 Am 2022 (727), Sch 1[27]; 2023 (36), sec 4. Sec 2.159 Am 2023 (458), Sch 3.6[4] [5]; 2024 (654), Sch 1[9]. Sec 2.159A Ins 2024 (654), Sch 1[44]. Sec 2.161 Am 2024 (654), Sch 1[45]. Sec 2.165 Am 2022 (742), Sch 1[11]. Sec 2.165A Ins 2022 (742), Sch 1[12]. Part 2.3, Div 25A Rep 2022 (629), Sch 3.19[4]. Sec 2.166 Rep 2022 (629), Sch 3.19[4]. Sec 2.167 Rep 2022 (629), Sch 3.19[4]. Sec 2.169 Ins 2022 (132), Sch 1[13]. Rep 2022 (461), Sch 2.1[1]. Part 2.3, Div 27 Ins 2022 (274), Sch 1. Sec 2.170 Ins 2022 (274), Sch 1. Part 2.3, Div 28 Ins 2022 (825), Sch 1[4]. Sec 2.171 Ins 2022 (825), Sch 1[4]. Part 2.3, Div 29 Ins 2024 (505), Sch 1[1]. Part 2.3, Div 29, Subdiv 1 Ins 2024 (505), Sch 1[1]. Sec 2.172 Ins 2024 (505), Sch 1[1]. Sec 2.173 Ins 2024 (505), Sch 1[1]. Part 2.3, Div 29, Subdiv 2 Ins 2024 (505), Sch 1[1]. Sec 2.174 Ins 2024 (505), Sch 1[1]. Sec 2.175 Ins 2024 (505), Sch 1[1]. Part 2.3, Div 29, Subdiv 3 Ins 2024 (505), Sch 1[1]. Sec 2.176 Ins 2024 (505), Sch 1[1]. Sec 2.177 Ins 2024 (505), Sch 1[1]. Sec 2.178 Ins 2024 (505), Sch 1[1]. Sec 2.179 Ins 2024 (505), Sch 1[1]. Sec 3.3 Am 2022 (742), Sch 1[13]; 2023 (83), Sch 2.6[2]; 2023 (609), Sch 2.22[3]; 2024 (585), Sch 1[13]. Sec 3.6 Am 2022 (461), Sch 2.1[2]. Sec 3.10 Am 2023 (609), Sch 2.22[4]. Sec 3.15 Am 2022 (517), Sch 1[2] [3]. Sec 3.16 Am 2024 (609), Sch 2[2]. Sec 3.17 Am 2022 (742), Sch 1[14]; 2025 (291), Sch 3[3]. Sec 3.18 Am 2022 (629), Sch 3.19[5]; 2023 (523), Sch 2.8[3]–[7]. Sec 3.19 Am 2024 (585), Sch 1[14]. Sec 3.21 Am 2022 (517), Sch 1[4]; 2023 No 35, Sch 4.40. Sec 3.24 Am 2022 (727), Sch 1[28]–[30]. Sec 3.34 Am 2022 (517), Sch 1[6]; 2022 (727), Sch 1[31] [32]; 2022 (742), Sch 1[15]; 2024 (115), Sch 1[5]; 2024 (585), Sch 1[15] [16]. Sec 3.36 Am 2022 (742), Sch 1[16]; 2023 (523), Sch 2.8[8] [9]. Sec 3.37 Am 2022 (742), Sch 1[16]; 2024 (585), Sch 1[17]–[26]. Sec 3.37A Ins 2024 (585), Sch 1[28]. Sec 3.38A Ins 2024 (585), Sch 1[28]. Sec 3.38 Am 2024 (585), Sch 1[27]. Sec 3.39 Am 2022 (742), Sch 1[16] [17]; 2024 (115), Sch 1[6]; 2024 (585), Sch 1[29]–[33]; 2025 (291), Sch 3[4]. Sec 3.40 Am 2022 (742), Sch 1[16] [17]; 2024 (115), Sch 1[7]–[9]; 2024 (585), Sch 1[34]–[37]. Sec 3.41 Am 2022 (742), Sch 1[16]. Sec 3.44 Am 2022 (517), Sch 1[6]; 2022 (727), Sch 1[33] [34]. Sec 3.46 Am 2024 (654), Sch 1[46]. Sec 3.47 Am 2024 (654), Sch 1[47] [48]. Sec 3.49 Am 2025 (291), Sch 3[5]. Sec 3.51 Am 2022 (517), Sch 1[6]; 2022 (727), Sch 1[35] [36]. Sec 3.56 Am 2025 (291), Sch 3[6]. Sec 4.2 Am 2023 (523), Sch 2.8[10]. Sec 4.5 Am 2024 (585), Sch 1[38]. Sec 4.7 Am 2023 (523), Sch 2.8[11]. Chapter 5, heading Am 2022 (373), Sch 1[1]. Sec 5.2 Am 2022 (373), Sch 1[2]–[4]; 2022 (517), Sch 1[9] [10]; 2023 (523), Sch 2.8[12]; 2024 No 67, Sch 5.6[1]. Sec 5.3 Subst 2022 (373), Sch 1[5]. Am 2022 (517), Sch 1[11]. Sec 5.4 Am 2022 (517), Sch 1[12]–[15]. Sec 5.5 Am 2022 (373), Sch 1[6]. Sec 5.6 Subst 2022 (373), Sch 1[7]. Am 2022 (517), Sch 1[16]. Sec 5.9 Am 2022 (517), Sch 1[17]; 2023 (524), Sch 1.4[1] [2]. Sec 5.10 Am 2022 (373), Sch 1[8]. Sec 5.14 Am 2022 (373), Sch 1[9]; 2024 No 67, Sch 5.6[2]. Sec 5.16 Am 2022 (517), Sch 1[18]; 2023 (523), Sch 2.8[13]. Sec 5.17 Subst 2022 (373), Sch 1[10]. Sec 5.19A Ins 2022 (373), Sch 1[11]. Sec 5.19B Ins 2022 (373), Sch 1[11]. Sec 5.20 Am 2022 (373), Sch 1[12]–[16]. Sec 5.21 Am 2024 (29), Sch 1[1] [2]. Sec 5.22 Am 2023 (524), Sch 1.4[3]. Sec 5.23A Ins 2022 (629), Sch 3.19[6]. Land Use Table Am 2022 (373), Sch 1[17]–[20]. Sec 5.24 Am 2022 (373), Sch 1[21]–[24]. Sec 5.25 Am 2022 (373), Sch 1[23] [25]–[27]. Sec 5.26 Am 2022 (373), Sch 1[6]. Sec 5.27 Am 2023 (523), Sch 2.8[13]. Sec 5.28 Am 2023 (523), Sch 2.8[13]. Sec 5.29 Am 2022 (373), Sch 1[6] [28]–[33]. Sec 5.30 Am 2022 (373), Sch 1[6] [32] [34]. Sec 5.31 Am 2022 (373), Sch 1[35] [36]; 2022 (517), Sch 1[19] [20]. Chapter 6 Ins 2022 (248), Sch 1[1]. Part 6.1 Ins 2022 (248), Sch 1[1]. Sec 6.1 Ins 2022 (248), Sch 1[1]. Sec 6.2 Ins 2022 (248), Sch 1[1]. Sec 6.3 Ins 2022 (248), Sch 1[1]. Sec 6.4 Ins 2022 (248), Sch 1[1]. Part 6.2 Ins 2022 (248), Sch 1[1]. Sec 6.5 Ins 2022 (248), Sch 1[1]. Sec 6.6 Ins 2022 (248), Sch 1[1]. Sec 6.7 Ins 2022 (248), Sch 1[1]. Am 2022 (742), Sch 1[18]–[25]. Part 6.3 Ins 2022 (248), Sch 1[1]. Sec 6.8 Ins 2022 (248), Sch 1[1]. Sec 6.9 Ins 2022 (248), Sch 1[1]. Part 6.4 Ins 2022 (248), Sch 1[1]. Sec 6.10 Ins 2022 (248), Sch 1[1]. Sec 6.11 Ins 2022 (248), Sch 1[1]. Am 2024 (654), Sch 1[49]. Sch 1, heading Am 2022 (248), Sch 1[2]. Sch 1 Am 2022 (517), Sch 1[1] [7]; 2022 (742), Sch 1[26]–[28]. Sch 2, heading Am 2022 (248), Sch 1[3]. Sch 3, heading Am 2022 (248), Sch 1[4]. Sch 4, heading Am 2022 (248), Sch 1[5]. Sch 4 Am 2022 (132), Sch 1[14]–[23]; 2022 (517), Sch 1[21]; 2022 (727), Sch 1[37]. Sch 4A Ins 2024 (505), Sch 1[2]. Sch 5, heading Am 2022 (248), Sch 1[6]. Sch 5 Am 2022 (517), Sch 1[7]; 2022 (742), Sch 1[29] [30]; 2024 (585), Sch 1[39]–[42]; 2024 (654), Sch 1[50]. Sch 6, heading Subst 2022 (248), Sch 1[7]. Sch 6 Am 2022 (517), Sch 1[22]; 2023 (609), Sch 2.22[5]–[7]; 2024 (115), Sch 1[10]. Sch 7, heading Subst 2022 (248), Sch 1[8]. Sch 7 Am 2022 (517), Sch 1[23]; 2023 (609), Sch 2.22[8]–[10]. Sch 8, heading Subst 2022 (248), Sch 1[9]; 2024 (585), Sch 1[43]. Sch 8 Subst 2024 (585), Sch 1[43]. Sch 9, heading Am 2022 (248), Sch 1[10]. Sch 9 Am 2023 (83), Sch 2.6[3]; 2023 (609), Sch 2.22[11]. Sch 10, heading Am 2022 (248), Sch 1[11]. Sch 10 Am 2022 (373), Sch 1[37]–[51]; 2022 (517), Sch 1[7]; 2024 (609), Sch 2[3]. Sch 11, heading Am 2022 (248), Sch 1[11]. Sch 11 Am 2022 (373), Sch 1[4] [45] [49] [52]–[66]; 2023 (523), Sch 2.8[14]. Sch 12 Ins 2022 (373), Sch 1[67]. Sch 12 Rep 2021 (732), Sch 12. Ins 2022 (248), Sch 1[12]. Am 2024 (609), Sch 2[4]. Sch 13 Ins 2022 (248), Sch 1[12]. Am 2024 (654), Sch 1[51].
— Removed in the later version —